X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354123113003

Well Details

Well ID: 0354123113003
Loading map...
Location: 00/13-31-035-12W4/3
Location Alias: 00/13-31-35-12 W4M
Location Alias 2: 00/13-31-035-12 W4/03
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 12
Section: 31
County/Municipality: County of Paintearth No. 18
Well Name: ONSTAD PROVOST 13-31-35-12
Operator Name: Goodland Energy Ltd.
License Number: 0349777
License Date: 2006-01-23
License Status: Suspension
Spud Date: 2006-01-28
Final Drill Date: 2006-01-30
Well Total Depth: 1521.00 m
Surface Hole Latitude: 52.045688
Surface Hole Longitude: -111.705025

For data sources see[1][2]

Well History

Date Event
2006-01-23 Obtained License
2006-01-28 Direction Drilling Operation Performed - Deviate
2006-01-28 Surface Casing Operation Performed
2006-01-30 Finished Drilling
2006-01-30 Production Casing Operation Performed
2006-01-30 Well Log Performed
2006-01-30 Well Mode changed to Drilled and Cased
2006-01-31 Rig Released
2006-02-05 Perforation Treatment Performed - Jet Perforation
2006-02-05 Well Log Performed
2006-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-01 Plug Back Performed
2006-03-01 Well Log Performed
2006-03-04 Perforation Treatment Performed - Jet Perforation
2006-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-28 Plug Back Performed
2006-03-28 Well Log Performed
2006-04-03 Well Log Performed
2006-05-13 Perforation Treatment Performed - Jet Perforation
2018-10-19 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-01-28 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-05 Perforation 1405.00 1406.00 17
2006-03-01 Packing Device Capped w/Cement 1392.00 1400.00 0
2006-03-04 Perforation 1356.00 1357.00 17
2006-03-04 Perforation 1342.00 1343.00 17
2006-03-04 Perforation 1339.50 1340.50 17
2006-03-28 Packing Device Capped w/Cement 1327.80 1335.80 0
2006-03-28 Packing Device Capped w/Cement 1346.80 1354.80 0
2006-05-13 Perforation 394.00 397.00 17

For data sources see[5]



References