X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354132006002

Well Details

Well ID: 0354132006002
Loading map...
Location: 00/06-20-035-13W4/2
Location Alias: 00/06-20-35-13 W4M
Location Alias 2: 00/06-20-035-13 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 13
Section: 20
County/Municipality: County of Paintearth No. 18
Well Name: ACL SULLIVAN LAKE 6-20-35-13
Operator Name: Battle River Energy Ltd.
License Number: 0116927
License Date: 1985-08-14
License Status: Issued
Spud Date: 1985-08-17
Final Drill Date: 1985-08-22
Well Total Depth: 1089.00 m
Surface Hole Latitude: 52.018003
Surface Hole Longitude: -111.831721

For data sources see[1][2]

Well History

Date Event
1985-08-14 Obtained License
1985-08-18 Surface Casing Operation Performed
1985-08-22 Finished Drilling
1985-08-22 Well Log Performed
1985-08-22 Well Mode changed to Drilled and Cased
1985-08-24 Production Casing Operation Performed
1985-08-24 Rig Released
1985-09-13 Perforation Treatment Performed - Jet Perforation
1985-09-13 Well Log Performed
1985-09-17 Perforation Treatment Performed - Fractured
1985-09-23 Drill Stem Test Performed
1990-06-19 Well Log Performed
1990-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-20 Plug Back Performed
1990-06-22 Perforation Treatment Performed - Jet Perforation
1990-10-01 Well Began Production
1990-10-01 Well Fluid changed to Gas
1990-10-01 Well Mode changed to Flowing
1999-03-24 Perforation Treatment Performed - Jet Perforation
1999-03-24 Well Fluid changed to Gas
1999-03-24 Well Log Performed
1999-03-24 Well Mode changed to Flowing
1999-06-10 Perforation Treatment Performed - Fractured
2005-10-01 Well Fluid changed to Gas
2005-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-13 Perforation 1035.00 1038.50 7
1985-09-13 Perforation 1041.00 1042.00 7
1985-09-17 Fracture 1035.00 1042.00 0
1990-06-20 Packing Device Capped w/Cement 1017.00 1025.00 0
1990-06-22 Perforation 433.00 435.50 13
1999-03-24 Perforation 942.00 945.00 14
1999-03-24 Perforation 955.00 957.00 14
1999-06-10 Fracture 942.00 957.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5583 0.0 0.0 0.0
1992 8549 0.0 0.0 0.0
1993 8661 0.0 0.0 0.0
1994 8565 0.0 0.0 0.0
1995 7961 0.0 0.0 0.0
1996 8205 0.0 0.0 0.0
1997 8719 0.0 0.0 0.0
1998 7930 0.0 0.0 0.0
1999 6804 0.0 0.0 0.0
2000 8550 0.0 0.0 0.0
2001 8634 0.0 0.0 0.0
2002 8224 0.0 0.0 0.0
2003 8713 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 8654 0.0 0.0 0.0
2006 8755 0.0 0.0 0.0
2007 8682 0.0 0.0 0.0
2008 8015 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 7622 0.0 0.0 0.0
2011 7920 0.0 0.0 0.0
2012 6396 0.0 0.0 0.0
2013 8064 0.0 0.0 0.0
2014 7421 0.0 0.0 0.0
2015 5779 0.0 0.0 0.0
2016 6140 0.0 0.0 0.0
2017 6264 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8015 0.0 0.0 0.0
2020 1487 0.0 0.0 0.0

For data sources see[5]

References