X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354133001020

Well Details

Well ID: 0354133001020
Loading map...
Location: 02/01-30-035-13W4/0
Location Alias: 02/01-30-35-13 W4M
Location Alias 2: 02/01-30-035-13 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 13
Section: 30
County/Municipality: County of Paintearth No. 18
Well Name: ACL 102 SULLIVAN LAKE 1-30-35-13
Operator Name: Battle River Energy Ltd.
License Number: 0093094
License Date: 1981-11-03
License Status: Suspension
Spud Date: 1981-11-05
Final Drill Date: 1981-11-09
Well Total Depth: 991.00 m
Surface Hole Latitude: 52.028262
Surface Hole Longitude: -111.841159

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-03 Obtained License
1981-11-09 Drill Stem Test Performed
1981-11-09 Finished Drilling
1981-11-09 Well Log Performed
1981-11-09 Well Mode changed to Drilled and Cased
1981-11-10 Drill Stem Test Performed
1981-11-11 Production Casing Operation Performed
1982-09-14 Perforation Treatment Performed - Jet Perforation
1982-12-28 Well Began Production
1982-12-28 Well Fluid changed to Gas
1982-12-28 Well Mode changed to Flowing
1998-11-15 Perforation Treatment Performed - Fractured
1999-01-04 Well Log Performed
1999-01-05 Perforation Treatment Performed - Jet Perforation
1999-01-05 Well Fluid changed to Gas
1999-01-05 Well Mode changed to Flowing
1999-07-01 Well Fluid changed to Gas
1999-07-01 Well Mode changed to Suspended
2013-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-14 Perforation 955.00 956.00 14
1982-09-14 Perforation 959.00 960.00 14
1982-09-14 Perforation 969.00 970.00 14
1998-11-15 Fracture 955.00 970.00 0
1999-01-05 Perforation 443.00 444.00 13
2013-07-07 Packing Device Capped w/Cement 932.00 940.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 94 0.0 0.0 0.0
1983 2977 0.0 0.0 0.0
1984 4700 0.0 0.0 0.0
1985 3848 0.0 0.0 0.0
1986 2037 0.0 0.0 0.0
1988 5582 0.0 0.0 0.0
1989 6290 0.0 0.0 0.0
1990 5323 0.0 0.0 0.0
1991 5115 0.0 0.0 0.0
1992 7691 0.0 0.0 0.0
1993 8667 0.0 0.0 0.0
1994 7812 0.0 0.0 0.0
1995 3807 0.0 0.0 0.0
1996 5963 0.0 0.0 0.0
1997 8340 0.0 0.0 0.0
1998 6019 0.0 0.0 0.0
1999 358 0.0 0.0 0.0
2001 240 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1999-01-13 No Incident Encountered 0.00 0.00
2013-07-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References