X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354141410000

Well Details

Well ID: 0354141410000
Loading map...
Location: 00/10-14-035-14W4/0
Location Alias: 00/10-14-35-14 W4M
Location Alias 2: 00/10-14-035-14 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 14
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: ACL SULLIVAN LAKE 10-14-35-14
Operator Name: Battle River Energy Ltd.
License Number: 0082755
License Date: 1980-05-13
License Status: Issued
Spud Date: 1980-05-15
Final Drill Date: 1980-05-20
Well Total Depth: 1111.00 m
Surface Hole Latitude: 52.007032
Surface Hole Longitude: -111.891888

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-13 Obtained License
1980-05-20 Finished Drilling
1980-05-21 Drill Stem Test Performed
1980-05-22 Drill Stem Test Performed
1980-05-23 Drill Stem Test Performed
1980-05-24 Drill Stem Test Performed
1980-05-25 Production Casing Operation Performed
1980-06-08 Perforation Treatment Performed - Jet Perforation
1980-06-10 Perforation Treatment Performed - Jet Perforation
1980-06-11 Perforation Treatment Performed - Cement Squeeze
1980-06-15 Perforation Treatment Performed - Jet Perforation
1980-06-16 Perforation Treatment Performed - Jet Perforation
1980-07-02 Well Mode changed to Drilled and Cased
1980-09-02 Well Began Production
1980-09-02 Well Fluid changed to Crude Oil
1980-09-02 Well Mode changed to Pumping
1980-11-14 Well Fluid changed to Crude Oil
1980-11-14 Well Mode changed to Suspended
1981-08-12 Well Fluid changed to Crude Oil
1981-08-12 Well Mode changed to Pumping
1981-09-29 Well Fluid changed to Crude Oil
1981-09-29 Well Mode changed to Suspended
2001-02-14 Well Fluid changed to Crude Oil
2001-02-14 Well Mode changed to Pumping
2001-07-03 Well Fluid changed to Crude Oil
2001-07-03 Well Mode changed to Pumping
2008-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-08 Perforation 1094.50 1097.00 7
1980-06-10 Perforation 974.00 976.00 7
1980-06-11 Cement Squeeze 974.00 976.00 0
1980-06-15 Perforation 966.50 968.50 7
1980-06-16 Perforation 970.50 973.40 7
2008-01-27 Acid Treatment 1094.50 1097.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1536 0.0 0.0 0.0
1981 1128 0.0 0.0 0.0
2001 6350 0.0 0.0 0.0
2002 7733 0.0 0.0 0.0
2003 8619 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8752 0.0 0.0 0.0
2008 8156 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7839 0.0 0.0 0.0
2011 8167 0.0 0.0 0.0
2012 7836 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8779 0.0 0.0 0.0
2017 7810 0.0 0.0 0.0
2018 4110 0.0 0.0 0.0
2019 8009 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References