If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354202207002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.016659,"lon":-112.774867,"icon":""}]} |
Location: 00/07-22-035-20W4/2 | |
Location Alias: 00/07-22-35-20 W4M | |
Location Alias 2: 00/07-22-035-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 20 | |
Section: 22 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: TEAC FENNBV 7-22-35-20 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0009277 | |
License Date: 1955-03-10 | |
License Status: Issued | |
Spud Date: 1955-03-26 | |
Final Drill Date: 1955-04-14 | |
Well Total Depth: 1609.60 m | |
Surface Hole Latitude: 52.016659 | |
Surface Hole Longitude: -112.774867 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-03-10 | Obtained License |
1955-04-14 | Finished Drilling |
1955-04-16 | Drill Stem Test Performed |
1955-04-17 | Production Casing Operation Performed |
1955-04-18 | Perforation Treatment Performed - Open-Hole Completion |
1991-05-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-05-16 | Plug Back Performed |
1991-07-23 | Well Log Performed |
1991-07-24 | Perforation Treatment Performed - Jet Perforation |
1991-07-25 | Well Mode changed to Drilled and Cased |
1991-11-15 | Well Began Production |
1991-11-15 | Well Fluid changed to Gas |
1991-11-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-04-18 | Open Hole/Barefoot Completion | 1607.20 | 1609.60 | 0 |
1991-05-16 | Packing Device Capped w/Cement | 1423.00 | 1431.00 | 0 |
1991-07-24 | Perforation | 1311.00 | 1315.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 2039 | 0.0 | 0.0 | 0.0 |
1992 | 8485 | 0.0 | 0.0 | 0.0 |
1993 | 8602 | 0.0 | 0.0 | 0.0 |
1994 | 8568 | 0.0 | 0.0 | 0.0 |
1995 | 8755 | 0.0 | 0.0 | 0.0 |
1996 | 8583 | 0.0 | 0.0 | 0.0 |
1997 | 8729 | 0.0 | 0.0 | 0.0 |
1998 | 8326 | 0.0 | 0.0 | 0.0 |
1999 | 8257 | 0.0 | 0.0 | 0.0 |
2000 | 8754 | 0.0 | 0.0 | 0.0 |
2001 | 8648 | 0.0 | 0.0 | 0.0 |
2002 | 8440 | 0.0 | 0.0 | 0.0 |
2003 | 8612 | 0.0 | 0.0 | 0.0 |
2004 | 8680 | 0.0 | 0.0 | 0.0 |
2005 | 8646 | 0.0 | 0.0 | 0.0 |
2006 | 8440 | 0.0 | 0.0 | 0.0 |
2007 | 8174 | 0.0 | 0.0 | 0.0 |
2008 | 8708 | 0.0 | 0.0 | 0.0 |
2009 | 8709 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8572 | 0.0 | 0.0 | 0.0 |
2013 | 6789 | 0.0 | 0.0 | 0.0 |
2014 | 8580 | 0.0 | 0.0 | 0.0 |
2015 | 8632 | 0.0 | 0.0 | 0.0 |
2016 | 8505 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]