X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354202606000

Well Details

Well ID: 0354202606000
Loading map...
Location: 00/06-26-035-20W4/0
Location Alias: 00/06-26-35-20 W4M
Location Alias 2: 00/06-26-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 26
County/Municipality: Big Valley
Well Name: BEARSPAW FENNBV 6-26N-35-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0007229
License Date: 1953-10-28
License Status: Issued
Spud Date: 1953-11-02
Final Drill Date: 1953-11-24
Well Total Depth: 1637.40 m
Surface Hole Latitude: 52.032512
Surface Hole Longitude: -112.757787

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-10-28 Obtained License
1953-11-24 Finished Drilling
1953-11-24 Well Mode changed to Drilled and Cased
1953-11-25 Drill Stem Test Performed
1953-11-27 Production Casing Operation Performed
1953-11-29 Perforation Treatment Performed - Jet Perforation
1953-12-10 Well Began Production
1953-12-10 Well Fluid changed to Crude Oil
1953-12-10 Well Mode changed to Flowing
1974-03-06 Well Fluid changed to Crude Oil
1974-03-06 Well Mode changed to Pumping
1984-09-04 Perforation Treatment Performed - Cement Plug
1984-09-05 Perforation Treatment Performed - Jet Perforation
1984-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-21 Perforation Treatment Performed - Jet Perforation
1987-01-21 Well Log Performed
1987-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-23 Perforation Treatment Performed - Cement Plug
1987-01-23 Well Log Performed
1987-01-24 Perforation Treatment Performed - Cement Plug
1987-05-02 Perforation Treatment Performed - Jet Perforation
1987-05-03 Perforation Treatment Performed - Cement Squeeze
1987-05-06 Perforation Treatment Performed - Jet Perforation
1987-05-07 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-07 Perforation Treatment Performed - Jet Perforation
1987-05-09 Perforation Treatment Performed - Acid Wash - No Pressure
1987-05-09 Perforation Treatment Performed - Jet Perforation
1987-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-10 Perforation Treatment Performed - Jet Perforation
1987-05-11 Perforation Treatment Performed - Jet Perforation
1987-05-14 Perforation Treatment Performed - Jet Perforation
1987-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-15 Well Fluid changed to Crude Oil
1990-03-15 Well Mode changed to Suspended
1991-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-12 Plug Back Performed
1991-01-12 Well Fluid changed to Crude Oil
1991-01-12 Well Mode changed to Abandoned Zone
1997-05-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-29 Perforation 1588.80 1598.30 13
1987-05-02 Perforation 1584.10 1584.60 13
1987-05-03 Cement Squeeze 1584.10 1587.30 0
1987-05-06 Perforation 1584.50 1585.50 13
1987-05-07 Acid Wash 1584.50 1585.50 0
1987-05-07 Perforation 1584.80 1585.80 13
1987-05-09 Perforation 1586.00 1586.70 13
1987-05-09 Acid Wash 1584.50 1586.70 0
1987-05-10 Perforation 1584.70 1586.70 13
1987-05-10 Acid Treatment 1584.50 1586.70 0
1987-05-11 Perforation 1586.00 1587.00 13
1984-09-04 Cement Plug 1592.50 1637.40 0
1987-05-14 Perforation 1586.70 1587.70 13
1987-05-15 Acid Treatment 1584.50 1587.70 0
1991-01-12 Packing Device Capped w/Cement 1540.00 1542.00 0
1997-05-05 Perforation 1297.20 1299.70 13
1984-09-05 Perforation 1586.70 1588.80 13
1984-09-12 Acid Treatment 1586.70 1588.80 0
1985-11-06 Acid Treatment 1586.70 1588.80 0
1987-01-21 Perforation 1585.50 1587.30 13
1987-01-22 Acid Treatment 1585.50 1587.30 0
1987-01-23 Cement Plug 1588.70 1592.50 0
1987-01-24 Cement Plug 1588.40 1588.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6876 0.0 0.0 0.0
1968 6416 0.0 0.0 0.0
1969 7136 0.0 0.0 0.0
1970 6959 0.0 0.0 0.0
1971 5988 0.0 0.0 0.0
1972 6730 0.0 0.0 0.0
1973 6755 0.0 0.0 0.0
1974 6467 0.0 0.0 0.0
1975 7928 0.0 0.0 0.0
1976 5978 0.0 0.0 0.0
1977 5715 0.0 0.0 0.0
1978 5556 0.0 0.0 0.0
1979 6572 0.0 0.0 0.0
1980 6471 0.0 0.0 0.0
1981 6949 0.0 0.0 0.0
1982 3995 0.0 0.0 0.0
1983 6755 0.0 0.0 0.0
1984 6864 0.0 0.0 0.0
1985 5759 0.0 0.0 0.0
1986 6280 0.0 0.0 0.0
1987 7449 0.0 0.0 0.0
1988 8298 0.0 0.0 0.0
1989 7693 0.0 0.0 0.0
1990 1468 0.0 0.0 0.0

For data sources see[5]

References