If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354262106002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.01842,"lon":-113.663005,"icon":""}]} |
| Location: 00/06-21-035-26W4/2 | |
| Location Alias: 00/06-21-35-26 W4M | |
| Location Alias 2: 00/06-21-035-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 21 | |
| County/Municipality: Red Deer County | |
| Well Name: Vantage WIM 6-21-35-26 | |
| Operator Name: Vantage Point Resources Inc. | |
| License Number: 0111449 | |
| License Date: 1984-12-06 | |
| License Status: Issued | |
| Spud Date: 1984-12-07 | |
| Final Drill Date: 1984-12-13 | |
| Well Total Depth: 1895.00 m | |
| Surface Hole Latitude: 52.018420 | |
| Surface Hole Longitude: -113.663005 |
| Date | Event |
|---|---|
| 1984-12-06 | Obtained License |
| 1984-12-08 | Surface Casing Operation Performed |
| 1984-12-13 | Finished Drilling |
| 1984-12-13 | Well Mode changed to Drilled and Cased |
| 1984-12-14 | Well Log Performed |
| 1984-12-15 | Drill Stem Test Performed |
| 1984-12-16 | Drill Stem Test Performed |
| 1984-12-18 | Drill Stem Test Performed |
| 1984-12-19 | Drill Stem Test Performed |
| 1984-12-20 | Drill Stem Test Performed |
| 1984-12-21 | Production Casing Operation Performed |
| 1984-12-22 | Rig Released |
| 1985-01-14 | Well Log Performed |
| 1985-01-16 | Perforation Treatment Performed - Jet Perforation |
| 1985-01-16 | Well Log Performed |
| 1985-01-18 | Perforation Treatment Performed - Fractured |
| 1985-07-30 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 1985-08-01 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 1985-08-03 | Perforation Treatment Performed - Jet Perforation |
| 1985-08-03 | Well Log Performed |
| 1986-01-03 | Well Began Production |
| 1986-01-03 | Well Fluid changed to Gas |
| 1986-01-03 | Well Mode changed to Flowing |
| 1987-11-05 | Perforation Treatment Performed - Jet Perforation |
| 1987-11-05 | Well Log Performed |
| 1987-11-11 | Perforation Treatment Performed - Fractured |
| 1987-11-17 | Well Fluid changed to Gas |
| 1987-11-17 | Well Mode changed to Flowing |
| 1987-12-02 | Well Log Performed |
| 1987-12-09 | Well Log Performed |
| 1988-12-09 | Perforation Treatment Performed - Jet Perforation |
| 1988-12-09 | Well Log Performed |
| 1989-01-30 | Perforation Treatment Performed - Fractured |
| 1993-07-01 | Well Fluid changed to Gas |
| 1993-07-01 | Well Mode changed to Suspended |
| 1997-07-25 | Well Log Performed |
| 2013-08-27 | Perforation Treatment Performed - Cement Squeeze |
| 2013-08-27 | Plug Back Performed |
| 2013-09-07 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-11 | Well Log Performed |
| 2013-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-09-15 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-20 | Perforation Treatment Performed - Fractured |
| 2013-09-24 | Perforation Treatment Performed - Jet Perforation |
| 2013-09-24 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-01-16 | Perforation | 1626.50 | 1627.50 | 13 |
| 1987-11-05 | Perforation | 1055.50 | 1057.50 | 7 |
| 1987-11-05 | Perforation | 1061.00 | 1063.50 | 7 |
| 1987-11-11 | Fracture | 1052.50 | 1063.50 | 0 |
| 1988-12-09 | Perforation | 1836.00 | 1838.50 | 13 |
| 1989-01-30 | Fracture | 1836.00 | 1838.50 | 0 |
| 2013-08-27 | Cement Squeeze | 1052.50 | 1063.80 | 0 |
| 2013-09-07 | Perforation | 1620.50 | 1622.00 | 13 |
| 2013-09-07 | Perforation | 1626.50 | 1627.50 | 13 |
| 2013-09-07 | Perforation | 1622.50 | 1623.50 | 13 |
| 2013-09-12 | Packing Device Capped w/Cement | 1620.50 | 1627.50 | 0 |
| 1985-01-16 | Perforation | 1620.50 | 1622.00 | 13 |
| 2013-09-15 | Perforation | 1823.50 | 1829.00 | 20 |
| 2013-09-20 | Fracture | 1823.50 | 1838.50 | 0 |
| 2013-09-24 | Perforation | 1835.50 | 1838.50 | 17 |
| 1985-01-16 | Perforation | 1622.50 | 1623.50 | 13 |
| 1985-01-18 | Fracture | 1620.50 | 1627.50 | 0 |
| 1985-07-30 | Casing Patch | 1619.00 | 1625.00 | 0 |
| 1985-08-01 | Casing Patch | 1626.50 | 1627.50 | 0 |
| 1985-08-01 | Casing Patch | 1625.80 | 1628.90 | 0 |
| 1985-08-03 | Perforation | 1836.00 | 1838.50 | 13 |
| 1987-11-05 | Perforation | 1052.50 | 1053.50 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1986 | 5371 | 0.0 | 0.0 | 0.0 |
| 1987 | 5041 | 0.0 | 0.0 | 0.0 |
| 1988 | 7485 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]