X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355040304020

Well Details

Well ID: 0355040304020
Loading map...
Location: 02/04-03-035-04W5/0
Location Alias: 02/04-03-35-04 W5M
Location Alias 2: 02/04-03-035-04 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 04
Section: 03
County/Municipality: Red Deer County
Well Name: NAL GARR 4-3-35-4
Operator Name: NAL Resources Limited
License Number: 0433578
License Date: 2011-05-17
License Status: Issued
Spud Date: 2011-07-18
Final Drill Date: 2011-08-02
Well Total Depth: 3542.00 m
Surface Hole Latitude: 51.985096
Surface Hole Longitude: -114.498116

For data sources see[1][2]

Well History

Date Event
2011-05-17 Obtained License
2011-07-20 Surface Casing Operation Performed
2011-07-25 Direction Drilling Operation Performed - Horizontal
2011-07-27 Intermediate Casing Operation Performed
2011-07-29 Well Log Performed
2011-08-02 Finished Drilling
2011-08-02 Well Mode changed to Drilled and Cased
2011-08-04 Liner Casing Operation Performed
2011-08-05 Rig Released
2011-08-15 Well Log Performed
2011-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-14 Well Began Production
2011-10-14 Well Fluid changed to Crude Oil
2011-10-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-25 1765.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-26 Multi-Stage Fracture 3527.30 3527.40 0
2011-08-28 Multi-Stage Fracture 2556.70 2556.80 0
2011-08-28 Multi-Stage Fracture 2466.90 2467.00 0
2011-08-28 Multi-Stage Fracture 2375.90 2376.00 0
2011-08-28 Multi-Stage Fracture 2285.40 2285.60 0
2011-08-28 Multi-Stage Fracture 2197.70 2197.80 0
2011-08-26 Multi-Stage Fracture 3439.00 3439.10 0
2011-08-27 Multi-Stage Fracture 3174.20 3174.30 0
2011-08-28 Multi-Stage Fracture 3084.20 3084.30 0
2011-08-28 Multi-Stage Fracture 2997.30 2997.40 0
2011-08-28 Multi-Stage Fracture 2909.40 2909.50 0
2011-08-28 Multi-Stage Fracture 2823.10 2823.20 0
2011-08-28 Multi-Stage Fracture 2734.20 2734.30 0
2011-08-28 Multi-Stage Fracture 2646.10 2646.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1856 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 8586 0.0 0.0 0.0
2014 8409 0.0 0.0 0.0
2015 8686 0.0 0.0 0.0
2016 8517 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 8396 0.0 0.0 0.0
2019 8755 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References