X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355050106000

Well Details

Well ID: 0355050106000
Loading map...
Location: 00/06-01-035-05W5/0
Location Alias: 00/06-01-35-05 W5M
Location Alias 2: 00/06-01-035-05 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 01
County/Municipality: Clearwater County
Well Name: NAL CAROL 6-1-35-5
Operator Name: NAL Resources Limited
License Number: 0100136
License Date: 1983-01-11
License Status: Issued
Spud Date: 1983-05-12
Final Drill Date: 1983-06-11
Well Total Depth: 2724.00 m
Surface Hole Latitude: 51.974192
Surface Hole Longitude: -114.589508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-11 Obtained License
1983-06-11 Finished Drilling
1983-06-11 Well Mode changed to Drilled and Cased
1983-06-12 Drill Stem Test Performed
1983-06-14 Drill Stem Test Performed
1983-06-16 Production Casing Operation Performed
1983-07-29 Perforation Treatment Performed - Jet Perforation
1983-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-31 Perforation Treatment Performed - Fractured
1983-08-25 Perforation Treatment Performed - Jet Perforation
1983-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-03 Perforation Treatment Performed - Cement Squeeze
1983-10-03 Perforation Treatment Performed - Jet Perforation
1983-10-09 Perforation Treatment Performed - Jet Perforation
1983-10-12 Perforation Treatment Performed - Fractured
1983-10-18 Well Began Production
1983-10-18 Well Fluid changed to Crude Oil
1983-10-18 Well Mode changed to Flowing
1983-10-30 Well Log Performed
1983-10-31 Well Log Performed
1983-12-23 Well Fluid changed to Crude Oil
1983-12-23 Well Mode changed to Suspended
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Flowing
2004-02-27 Perforation Treatment Performed - Jet Perforation
2004-03-01 Perforation Treatment Performed - Fractured
2004-04-01 Well Fluid changed to Crude Oil
2004-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-07-29 Perforation 2588.50 2590.50 13
1983-10-09 Perforation 2594.00 2596.00 13
1983-10-12 Fracture 2594.00 2596.00 0
2004-02-27 Perforation 2395.00 2400.00 17
2004-02-27 Perforation 2390.00 2395.00 17
2004-03-01 Fracture 2390.00 2400.00 0
1983-07-29 Perforation 2594.00 2596.00 13
1983-07-30 Acid Treatment 2588.50 2596.00 0
1983-07-31 Fracture 2588.50 2596.00 0
1983-08-25 Perforation 2614.50 2615.00 13
1983-08-25 Perforation 2594.00 2598.00 13
1983-08-30 Packing Device Capped w/Cement 2611.50 2611.50 0
1983-10-03 Perforation 2614.50 2615.00 13
1983-10-03 Cement Squeeze 2588.50 2615.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1329 0.0 0.0 0.0
1987 5170 0.0 0.0 0.0
1988 7320 0.0 0.0 0.0
1989 8712 0.0 0.0 0.0
1990 8254 0.0 0.0 0.0
1991 8752 0.0 0.0 0.0
1992 8633 0.0 0.0 0.0
1993 8704 0.0 0.0 0.0
1994 8673 0.0 0.0 0.0
1995 8579 0.0 0.0 0.0
1996 8704 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8495 0.0 0.0 0.0
1999 7167 0.0 0.0 0.0
2000 8737 0.0 0.0 0.0
2001 8519 0.0 0.0 0.0
2002 7271 0.0 0.0 0.0
2003 7487 0.0 0.0 0.0
2004 672 0.0 0.0 0.0

For data sources see[5]

References