X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355050106002

Well Details

Well ID: 0355050106002
Loading map...
Location: 00/06-01-035-05W5/2
Location Alias: 00/06-01-35-05 W5M
Location Alias 2: 00/06-01-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 01
County/Municipality: Clearwater County
Well Name: NAL CAROL 6-1-35-5
Operator Name: NAL Resources Limited
License Number: 0100136
License Date: 1983-01-11
License Status: Issued
Spud Date: 1983-05-12
Final Drill Date: 1983-06-11
Well Total Depth: 2724.00 m
Surface Hole Latitude: 51.974192
Surface Hole Longitude: -114.589508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-01-11 Obtained License
1983-06-11 Finished Drilling
1983-06-11 Well Mode changed to Drilled and Cased
1983-06-12 Drill Stem Test Performed
1983-06-14 Drill Stem Test Performed
1983-06-16 Production Casing Operation Performed
1983-07-29 Perforation Treatment Performed - Jet Perforation
1983-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-31 Perforation Treatment Performed - Fractured
1983-08-25 Perforation Treatment Performed - Jet Perforation
1983-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-03 Perforation Treatment Performed - Cement Squeeze
1983-10-03 Perforation Treatment Performed - Jet Perforation
1983-10-09 Perforation Treatment Performed - Jet Perforation
1983-10-12 Perforation Treatment Performed - Fractured
1983-10-30 Well Log Performed
1983-10-31 Well Log Performed
2004-02-27 Perforation Treatment Performed - Jet Perforation
2004-03-01 Perforation Treatment Performed - Fractured
2004-04-01 Well Began Production
2004-04-01 Well Fluid changed to Gas
2004-04-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-07-29 Perforation 2588.50 2590.50 13
1983-10-09 Perforation 2594.00 2596.00 13
1983-10-12 Fracture 2594.00 2596.00 0
2004-02-27 Perforation 2395.00 2400.00 17
2004-02-27 Perforation 2390.00 2395.00 17
2004-03-01 Fracture 2390.00 2400.00 0
1983-07-29 Perforation 2594.00 2596.00 13
1983-07-30 Acid Treatment 2588.50 2596.00 0
1983-07-31 Fracture 2588.50 2596.00 0
1983-08-25 Perforation 2614.50 2615.00 13
1983-08-25 Perforation 2594.00 2598.00 13
1983-08-30 Packing Device Capped w/Cement 2611.50 2611.50 0
1983-10-03 Perforation 2614.50 2615.00 13
1983-10-03 Cement Squeeze 2588.50 2615.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 6551 0.0 0.0 0.0
2005 8615 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8579 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8615 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 6896 0.0 0.0 0.0
2015 7431 0.0 0.0 0.0
2016 8725 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 8285 0.0 0.0 0.0
2019 8224 0.0 0.0 0.0
2020 1544 0.0 0.0 0.0

For data sources see[5]

References