X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355051208000

Well Details

Well ID: 0355051208000
Loading map...
Location: 00/08-12-035-05W5/0
Location Alias: 00/08-12-35-05 W5M
Location Alias 2: 00/08-12-035-05 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 12
County/Municipality: Clearwater County
Well Name: NAL CAROL 8-12-35-5
Operator Name: NAL Resources Limited
License Number: 0097741
License Date: 1982-10-05
License Status: Issued
Spud Date: 1982-10-21
Final Drill Date: 1982-11-23
Well Total Depth: 2730.00 m
Surface Hole Latitude: 51.991196
Surface Hole Longitude: -114.578095

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-05 Obtained License
1982-11-23 Finished Drilling
1982-11-23 Well Mode changed to Drilled and Cased
1982-11-26 Well Log Performed
1982-11-27 Production Casing Operation Performed
1982-12-05 Perforation Treatment Performed - Jet Perforation
1982-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-17 Perforation Treatment Performed - Jet Perforation
1982-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-19 Perforation Treatment Performed - Jet Perforation
1982-12-21 Perforation Treatment Performed - Fractured
1983-05-01 Well Began Production
1983-05-01 Well Fluid changed to Crude Oil
1983-05-01 Well Mode changed to Flowing
1995-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-05 Plug Back Performed
1995-02-05 Well Fluid changed to Crude Oil
1995-02-05 Well Mode changed to Abandoned Zone
1995-02-06 Perforation Treatment Performed - Jet Perforation
1995-02-10 Perforation Treatment Performed - Fractured
2003-10-14 Perforation Treatment Performed - Jet Perforation
2003-10-17 Perforation Treatment Performed - Fractured
2004-11-04 Perforation Treatment Performed - Jet Perforation
2004-11-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-12-05 Perforation 2692.00 2695.00 10
1995-02-06 Perforation 2158.30 2160.50 13
1995-02-10 Fracture 2122.00 2160.50 0
2003-10-14 Perforation 2600.00 2603.00 14
2003-10-14 Perforation 2597.00 2598.00 14
2003-10-17 Fracture 2597.00 2603.00 0
2004-11-04 Perforation 2125.20 2126.50 17
2004-11-08 Fracture 2122.00 2160.50 0
1982-12-16 Packing Device Capped w/Cement 2678.50 2686.50 0
1982-12-17 Perforation 2650.50 2654.00 10
1982-12-19 Packing Device Capped w/Cement 2640.00 2648.00 0
1982-12-19 Perforation 2597.00 2598.00 4
1982-12-19 Perforation 2600.00 2603.00 10
1982-12-21 Fracture 2597.00 2603.00 0
1995-02-05 Packing Device Capped w/Cement 2582.00 2590.00 0
1995-02-06 Perforation 2122.00 2125.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 72 0.0 0.0 0.0
1984 2178 0.0 0.0 0.0
1985 4981 0.0 0.0 0.0
1986 8713 0.0 0.0 0.0
1987 8604 0.0 0.0 0.0
1988 8573 0.0 0.0 0.0
1989 8569 0.0 0.0 0.0
1990 7642 0.0 0.0 0.0
1991 7236 0.0 0.0 0.0
1992 7619 0.0 0.0 0.0
1993 7922 0.0 0.0 0.0
1994 4896 0.0 0.0 0.0
1995 744 0.0 0.0 0.0

For data sources see[5]

References