X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355051410002

Well Details

Well ID: 0355051410002
Loading map...
Location: 00/10-14-035-05W5/2
Location Alias: 00/10-14-35-05 W5M
Location Alias 2: 00/10-14-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 14
County/Municipality: Clearwater County
Well Name: NAL CAROL 10-14-35-5
Operator Name: NAL Resources Limited
License Number: 0124804
License Date: 1986-12-04
License Status: Abandoned
Spud Date: 2003-07-01
Final Drill Date: 2003-07-12
Well Total Depth: 2468.00 m
Surface Hole Latitude: 52.009266
Surface Hole Longitude: -114.603044

For data sources see[1][2]

Well History

Date Event
1986-12-04 Obtained License
2003-07-12 Finished Drilling
2003-07-12 Well Mode changed to Drilled and Cased
2003-07-14 Perforation Treatment Performed - Jet Perforation
2003-07-14 Rig Released
2008-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-13 Plug Back Performed
2008-08-13 Well Mode changed to Abandoned Zone
2018-09-10 Perforation Treatment Performed - Jet Perforation
2018-09-10 Perforation Treatment Performed - Remedial Casing
2018-09-11 Perforation Treatment Performed - Cement Plug
2018-09-11 Plug Back Performed
2018-11-29 Well Abandoned
2018-11-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-07-14 Perforation 2436.00 2437.00 17
2018-09-10 Remedial Casing Cementing 600.00 601.00 0
2018-09-10 Perforation 315.00 316.00 17
2018-09-10 Remedial Casing Cementing 315.00 316.00 0
2018-09-11 Cement Plug 558.00 915.00 0
2018-09-11 Cement Plug 267.00 558.00 0
2003-07-14 Perforation 2431.50 2434.50 17
2003-07-14 Perforation 2425.50 2426.50 17
2008-08-13 Packing Device Capped w/Cement 2407.00 2415.00 0
2018-09-10 Perforation 892.00 893.00 17
2018-09-10 Remedial Casing Cementing 892.00 893.00 0
2018-09-10 Perforation 732.00 733.00 17
2018-09-10 Remedial Casing Cementing 732.00 733.00 0
2018-09-10 Perforation 600.00 601.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-29 No Incident Encountered 0.00 0.00

For data sources see[5]

References