X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355051416002

Well Details

Well ID: 0355051416002
Loading map...
Location: 00/16-14-035-05W5/2
Location Alias: 00/16-14-35-05 W5M
Location Alias 2: 00/16-14-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 14
County/Municipality: Clearwater County
Well Name: NAL CAROL 16-14-35-5
Operator Name: NAL Resources Limited
License Number: 0093014
License Date: 1981-10-29
License Status: Suspension
Spud Date: 1981-11-14
Final Drill Date: 1981-12-09
Well Total Depth: 2743.00 m
Surface Hole Latitude: 52.010511
Surface Hole Longitude: -114.601880

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-29 Obtained License
1981-12-09 Finished Drilling
1981-12-09 Well Mode changed to Drilled and Cased
1981-12-10 Well Log Performed
1981-12-11 Drill Stem Test Performed
1981-12-12 Drill Stem Test Performed
1981-12-12 Kick Occurred
1981-12-13 Drill Stem Test Performed
1981-12-14 Drill Stem Test Performed
1981-12-15 Drill Stem Test Performed
1981-12-16 Production Casing Operation Performed
1981-12-29 Perforation Treatment Performed - Jet Perforation
1982-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-09 Perforation Treatment Performed - Jet Perforation
1982-01-11 Perforation Treatment Performed - Fractured
1982-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-29 Perforation Treatment Performed - Jet Perforation
1982-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-06 Perforation Treatment Performed - Jet Perforation
1982-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-25 Perforation Treatment Performed - Fractured
1982-09-16 Well Began Production
1982-09-16 Well Fluid changed to Crude Oil
1982-09-16 Well Mode changed to Pumping
1987-09-21 Well Fluid changed to Crude Oil
1987-09-21 Well Mode changed to Suspended
1989-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-05 Plug Back Performed
1989-12-05 Well Fluid changed to Crude Oil
1989-12-05 Well Log Performed
1989-12-05 Well Mode changed to Abandoned Zone
1989-12-07 Perforation Treatment Performed - Jet Perforation
1989-12-07 Well Log Performed
1989-12-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-29 Perforation 2713.00 2719.00 6
1982-08-16 Packing Device Capped w/Cement 2388.00 2396.00 0
1982-08-19 Acid Treatment 2310.00 2320.00 0
1982-08-25 Fracture 2310.00 2320.00 0
1989-12-05 Packing Device Capped w/Cement 2297.00 2305.00 0
1989-12-07 Perforation 2132.00 2135.00 13
1989-12-07 Perforation 2168.00 2170.00 4
1989-12-09 Fracture 2132.00 2170.00 0
1982-01-07 Packing Device Capped w/Cement 2697.00 2705.70 0
1982-01-09 Perforation 2615.50 2616.50 6
1982-01-09 Perforation 2619.50 2622.50 6
1982-01-11 Fracture 2615.50 2622.50 0
1982-07-28 Packing Device Capped w/Cement 2591.30 2601.00 0
1982-07-29 Perforation 2428.00 2433.00 10
1982-08-04 Packing Device Capped w/Cement 2398.00 2409.00 0
1982-08-06 Perforation 2310.00 2320.00 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2922 0.0 0.0 0.0
1983 8007 0.0 0.0 0.0
1984 8339 0.0 0.0 0.0
1985 6202 0.0 0.0 0.0
1986 4045 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-12-12 Kick 2743.00 2743.00

For data sources see[6]

References