If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0355051416003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.010511,"lon":-114.60188,"icon":""}]} |
| Location: 00/16-14-035-05W5/3 | |
| Location Alias: 00/16-14-35-05 W5M | |
| Location Alias 2: 00/16-14-035-05 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 14 | |
| County/Municipality: Clearwater County | |
| Well Name: NAL CAROL 16-14-35-5 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0093014 | |
| License Date: 1981-10-29 | |
| License Status: Suspension | |
| Spud Date: 1981-11-14 | |
| Final Drill Date: 1981-12-09 | |
| Well Total Depth: 2743.00 m | |
| Surface Hole Latitude: 52.010511 | |
| Surface Hole Longitude: -114.601880 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1981-10-29 | Obtained License |
| 1981-12-09 | Finished Drilling |
| 1981-12-09 | Well Mode changed to Drilled and Cased |
| 1981-12-10 | Well Log Performed |
| 1981-12-11 | Drill Stem Test Performed |
| 1981-12-12 | Drill Stem Test Performed |
| 1981-12-12 | Kick Occurred |
| 1981-12-13 | Drill Stem Test Performed |
| 1981-12-14 | Drill Stem Test Performed |
| 1981-12-15 | Drill Stem Test Performed |
| 1981-12-16 | Production Casing Operation Performed |
| 1981-12-29 | Perforation Treatment Performed - Jet Perforation |
| 1982-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-01-09 | Perforation Treatment Performed - Jet Perforation |
| 1982-01-11 | Perforation Treatment Performed - Fractured |
| 1982-07-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-07-29 | Perforation Treatment Performed - Jet Perforation |
| 1982-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-08-06 | Perforation Treatment Performed - Jet Perforation |
| 1982-08-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-08-25 | Perforation Treatment Performed - Fractured |
| 1989-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-12-05 | Plug Back Performed |
| 1989-12-05 | Well Log Performed |
| 1989-12-07 | Perforation Treatment Performed - Jet Perforation |
| 1989-12-07 | Well Log Performed |
| 1989-12-09 | Perforation Treatment Performed - Fractured |
| 1990-01-01 | Well Began Production |
| 1990-01-01 | Well Fluid changed to Crude Oil |
| 1990-01-01 | Well Mode changed to Flowing |
| 2001-09-11 | Well Fluid changed to Crude Oil |
| 2001-09-11 | Well Mode changed to Pumping |
| 2013-07-01 | Well Fluid changed to Crude Oil |
| 2013-07-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-12-29 | Perforation | 2713.00 | 2719.00 | 6 |
| 1982-08-16 | Packing Device Capped w/Cement | 2388.00 | 2396.00 | 0 |
| 1982-08-19 | Acid Treatment | 2310.00 | 2320.00 | 0 |
| 1982-08-25 | Fracture | 2310.00 | 2320.00 | 0 |
| 1989-12-05 | Packing Device Capped w/Cement | 2297.00 | 2305.00 | 0 |
| 1989-12-07 | Perforation | 2132.00 | 2135.00 | 13 |
| 1989-12-07 | Perforation | 2168.00 | 2170.00 | 4 |
| 1989-12-09 | Fracture | 2132.00 | 2170.00 | 0 |
| 1982-01-07 | Packing Device Capped w/Cement | 2697.00 | 2705.70 | 0 |
| 1982-01-09 | Perforation | 2615.50 | 2616.50 | 6 |
| 1982-01-09 | Perforation | 2619.50 | 2622.50 | 6 |
| 1982-01-11 | Fracture | 2615.50 | 2622.50 | 0 |
| 1982-07-28 | Packing Device Capped w/Cement | 2591.30 | 2601.00 | 0 |
| 1982-07-29 | Perforation | 2428.00 | 2433.00 | 10 |
| 1982-08-04 | Packing Device Capped w/Cement | 2398.00 | 2409.00 | 0 |
| 1982-08-06 | Perforation | 2310.00 | 2320.00 | 10 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 8713 | 0.0 | 0.0 | 0.0 |
| 1991 | 8708 | 0.0 | 0.0 | 0.0 |
| 1992 | 7605 | 0.0 | 0.0 | 0.0 |
| 1993 | 8493 | 0.0 | 0.0 | 0.0 |
| 1994 | 8545 | 0.0 | 0.0 | 0.0 |
| 1995 | 8711 | 0.0 | 0.0 | 0.0 |
| 1996 | 8586 | 0.0 | 0.0 | 0.0 |
| 1997 | 8631 | 0.0 | 0.0 | 0.0 |
| 1998 | 8256 | 0.0 | 0.0 | 0.0 |
| 1999 | 8759 | 0.0 | 0.0 | 0.0 |
| 2000 | 8521 | 0.0 | 0.0 | 0.0 |
| 2001 | 8567 | 0.0 | 0.0 | 0.0 |
| 2002 | 8759 | 0.0 | 0.0 | 0.0 |
| 2003 | 4392 | 0.0 | 0.0 | 0.0 |
| 2004 | 5136 | 0.0 | 0.0 | 0.0 |
| 2005 | 8057 | 0.0 | 0.0 | 0.0 |
| 2006 | 8735 | 0.0 | 0.0 | 0.0 |
| 2007 | 7319 | 0.0 | 0.0 | 0.0 |
| 2008 | 7318 | 0.0 | 0.0 | 0.0 |
| 2009 | 3802 | 0.0 | 0.0 | 0.0 |
| 2010 | 7441 | 0.0 | 0.0 | 0.0 |
| 2011 | 1416 | 0.0 | 0.0 | 0.0 |
| 2012 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1981-12-12 | Kick | 2743.00 | 2743.00 |
For data sources see[6]