X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355062202000

Well Details

Well ID: 0355062202000
Loading map...
Location: 00/02-22-035-06W5/0
Location Alias: 00/02-22-35-06 W5M
Location Alias 2: 00/02-22-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 22
County/Municipality: Clearwater County
Well Name: RIDGEBACK CAROL 2-22-35-6
Operator Name: Ridgeback Resources Inc.
License Number: 0434062
License Date: 2011-06-06
License Status: Issued
Spud Date: 2011-07-07
Final Drill Date: 2011-07-26
Well Total Depth: 3895.00 m
Surface Hole Latitude: 52.030875
Surface Hole Longitude: -114.769250

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-07-08 Surface Casing Operation Performed
2011-07-12 Direction Drilling Operation Performed - Horizontal
2011-07-18 Intermediate Casing Operation Performed
2011-07-26 Finished Drilling
2011-07-26 Perforation Treatment Performed - Open-Hole Completion
2011-07-26 Well Log Performed
2011-07-26 Well Mode changed to Drilled and Cased
2011-07-27 Liner Casing Operation Performed
2011-07-28 Rig Released
2011-08-07 Well Log Performed
2011-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-26 Perforation Treatment Performed - Jet Perforation
2011-09-26 Well Log Performed
2011-09-27 Perforation Treatment Performed - Remedial Casing
2011-09-29 Perforation Treatment Performed - Jet Perforation
2011-09-29 Perforation Treatment Performed - Remedial Casing
2011-09-29 Well Log Performed
2011-10-12 Well Log Performed
2011-10-22 Well Began Production
2011-10-22 Well Fluid changed to Crude Oil
2011-10-22 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-12 1904.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-26 Open Hole/Barefoot Completion 3893.00 3895.00 0
2011-09-08 Multi-Stage Fracture 3299.10 3299.20 0
2011-09-08 Multi-Stage Fracture 3227.90 3228.00 0
2011-09-08 Multi-Stage Fracture 3168.70 3168.80 0
2011-09-08 Multi-Stage Fracture 3096.50 3096.60 0
2011-09-08 Multi-Stage Fracture 3024.30 3024.40 0
2011-09-09 Multi-Stage Fracture 2965.50 2965.60 0
2011-09-19 Multi-Stage Fracture 2893.60 2893.70 0
2011-09-19 Multi-Stage Fracture 2821.60 2821.70 0
2011-09-19 Multi-Stage Fracture 2762.30 2762.40 0
2011-09-19 Multi-Stage Fracture 2689.60 2689.70 0
2011-08-28 Multi-Stage Fracture 3849.90 3850.00 0
2011-09-19 Multi-Stage Fracture 2617.50 2617.60 0
2011-09-19 Multi-Stage Fracture 2559.80 2559.90 0
2011-09-26 Perforation 593.00 594.00 17
2011-09-27 Remedial Casing Cementing 593.00 594.00 0
2011-09-29 Perforation 498.00 499.00 17
2011-09-29 Remedial Casing Cementing 498.00 499.00 0
2011-08-28 Multi-Stage Fracture 3775.40 3775.50 0
2011-08-28 Multi-Stage Fracture 3705.80 3705.90 0
2011-08-28 Multi-Stage Fracture 3647.20 3647.30 0
2011-08-28 Multi-Stage Fracture 3574.20 3574.30 0
2011-08-28 Multi-Stage Fracture 3502.10 3502.20 0
2011-08-28 Multi-Stage Fracture 3443.80 3443.90 0
2011-09-08 Multi-Stage Fracture 3371.00 3371.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 96 0.0 0.0 0.0
2012 6838 0.0 0.0 0.0
2013 8274 0.0 0.0 0.0
2014 4102 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8746 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 7994 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References