X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355062716000

Well Details

Well ID: 0355062716000
Loading map...
Location: 00/16-27-035-06W5/0
Location Alias: 00/16-27-35-06 W5M
Location Alias 2: 00/16-27-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 27
County/Municipality: Clearwater County
Well Name: RIDGEBACK CAROL 16-27-35-6
Operator Name: Ridgeback Resources Inc.
License Number: 0434608
License Date: 2011-06-24
License Status: Issued
Spud Date: 2011-08-02
Final Drill Date: 2011-08-22
Well Total Depth: 3847.00 m
Surface Hole Latitude: 52.027361
Surface Hole Longitude: -114.767425

For data sources see[1][2]

Well History

Date Event
2011-06-24 Obtained License
2011-08-03 Surface Casing Operation Performed
2011-08-07 Direction Drilling Operation Performed - Horizontal
2011-08-14 Intermediate Casing Operation Performed
2011-08-22 Finished Drilling
2011-08-22 Well Log Performed
2011-08-22 Well Mode changed to Drilled and Cased
2011-08-24 Liner Casing Operation Performed
2011-08-25 Rig Released
2011-08-26 Perforation Treatment Performed - Open-Hole Completion
2011-09-10 Well Log Performed
2011-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-14 Well Began Production
2011-10-14 Well Fluid changed to Crude Oil
2011-10-14 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-07 1961.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-26 Open Hole/Barefoot Completion 3842.00 3847.00 0
2011-09-27 Multi-Stage Fracture 3298.80 3298.90 0
2011-09-27 Multi-Stage Fracture 3236.60 3236.70 0
2011-09-27 Multi-Stage Fracture 3159.60 3159.70 0
2011-09-27 Multi-Stage Fracture 3099.80 3099.90 0
2011-09-27 Multi-Stage Fracture 3025.60 3025.70 0
2011-09-27 Multi-Stage Fracture 2953.80 2953.90 0
2011-09-28 Multi-Stage Fracture 2879.00 2879.10 0
2011-09-28 Multi-Stage Fracture 2819.50 2819.60 0
2011-09-28 Multi-Stage Fracture 2743.90 2744.00 0
2011-09-28 Multi-Stage Fracture 2668.20 2668.30 0
2011-09-26 Multi-Stage Fracture 3801.40 3801.50 0
2011-09-28 Multi-Stage Fracture 2607.00 2607.10 0
2011-09-28 Multi-Stage Fracture 2532.00 2532.10 0
2011-09-26 Multi-Stage Fracture 3740.40 3740.50 0
2011-09-26 Multi-Stage Fracture 3668.20 3668.30 0
2011-09-26 Multi-Stage Fracture 3610.50 3610.60 0
2011-09-26 Multi-Stage Fracture 3538.20 3538.30 0
2011-09-26 Multi-Stage Fracture 3479.60 3479.70 0
2011-09-27 Multi-Stage Fracture 3407.70 3407.80 0
2011-09-27 Multi-Stage Fracture 3347.10 3347.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 24 0.0 0.0 0.0
2012 6482 0.0 0.0 0.0
2013 8624 0.0 0.0 0.0
2014 4226 0.0 0.0 0.0
2015 8651 0.0 0.0 0.0
2016 8754 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 7989 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References