If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0355070107002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.974772,"lon":-114.866158,"icon":""}]} |
| Location: 00/07-01-035-07W5/2 | |
| Location Alias: 00/07-01-35-07 W5M | |
| Location Alias 2: 00/07-01-035-07 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 5 | |
| Range: 07 | |
| Section: 01 | |
| County/Municipality: Clearwater County | |
| Well Name: NAL CAROL 7-1-35-7 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0076257 | |
| License Date: 1979-06-11 | |
| License Status: Issued | |
| Spud Date: 1979-08-02 | |
| Final Drill Date: 1979-09-27 | |
| Well Total Depth: 3121.00 m | |
| Surface Hole Latitude: 51.974772 | |
| Surface Hole Longitude: -114.866158 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-06-11 | Obtained License |
| 1979-09-27 | Finished Drilling |
| 1979-09-27 | Well Mode changed to Drilled and Cased |
| 1979-10-02 | Production Casing Operation Performed |
| 1979-10-15 | Perforation Treatment Performed - Jet Perforation |
| 1979-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1979-11-01 | Perforation Treatment Performed - Jet Perforation |
| 1979-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-01-08 | Perforation Treatment Performed - Jet Perforation |
| 1984-01-08 | Well Began Production |
| 1984-01-08 | Well Fluid changed to Crude Oil |
| 1984-01-08 | Well Mode changed to Flowing |
| 1987-05-01 | Well Fluid changed to Crude Oil |
| 1987-05-01 | Well Mode changed to Suspended |
| 1994-11-01 | Well Fluid changed to Crude Oil |
| 1994-11-01 | Well Mode changed to Flowing |
| 1994-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-07-01 | Well Fluid changed to Crude Oil |
| 1997-07-01 | Well Mode changed to Suspended |
| 2002-03-06 | Perforation Treatment Performed - Cement Squeeze |
| 2002-03-06 | Plug Back Performed |
| 2002-03-06 | Well Fluid changed to Crude Oil |
| 2002-03-06 | Well Mode changed to Abandoned Zone |
| 2002-03-10 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-12 | Perforation Treatment Performed - Cement Squeeze |
| 2002-03-12 | Plug Back Performed |
| 2002-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2002-03-23 | Perforation Treatment Performed - Fractured |
| 2004-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-02-12 | Plug Back Performed |
| 2004-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-16 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-10-15 | Perforation | 2995.00 | 2999.00 | 6 |
| 2002-03-10 | Perforation | 2783.00 | 2790.00 | 13 |
| 2002-03-12 | Cement Squeeze | 2783.00 | 2790.00 | 0 |
| 2002-03-16 | Perforation | 2995.00 | 2999.00 | 6 |
| 2002-03-23 | Fracture | 2995.00 | 2999.00 | 0 |
| 2004-02-12 | Packing Device Capped w/Cement | 2980.50 | 2988.50 | 0 |
| 2004-02-13 | Perforation | 2783.00 | 2790.00 | 17 |
| 2004-02-16 | Fracture | 2783.00 | 2790.00 | 0 |
| 1979-10-16 | Acid Treatment | 2995.00 | 2999.00 | 0 |
| 1979-10-31 | Packing Device Capped w/Cement | 2985.00 | 2985.00 | 0 |
| 1979-11-01 | Perforation | 2783.00 | 2790.00 | 13 |
| 1979-11-02 | Acid Treatment | 2783.00 | 2790.00 | 0 |
| 1984-01-06 | Packing Device Capped w/Cement | 2752.00 | 2760.00 | 0 |
| 1984-01-08 | Perforation | 2511.00 | 2514.00 | 13 |
| 1994-11-23 | Acid Treatment | 2511.00 | 2514.00 | 0 |
| 2002-03-06 | Cement Squeeze | 2511.00 | 2514.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 4528 | 0.0 | 0.0 | 0.0 |
| 1985 | 144 | 0.0 | 0.0 | 0.0 |
| 1986 | 3999 | 0.0 | 0.0 | 0.0 |
| 1987 | 1720 | 0.0 | 0.0 | 0.0 |
| 1991 | 312 | 0.0 | 0.0 | 0.0 |
For data sources see[5]