X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364020801000

Well Details

Well ID: 0364020801000
Loading map...
Location: 00/01-08-036-02W4/0
Location Alias: 00/01-08-36-02 W4M
Location Alias 2: 00/01-08-036-02 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 02
Section: 08
County/Municipality: Special Areas No. 4
Well Name: ACL ET AL HZ PROVOST 1-8-36-2
Operator Name: Battle River Energy Ltd.
License Number: 0444615
License Date: 2012-03-02
License Status: Issued
Spud Date: 2012-06-30
Final Drill Date: 2012-07-05
Well Total Depth: 1976.00 m
Surface Hole Latitude: 52.083602
Surface Hole Longitude: -110.246419

For data sources see[1][2]

Well History

Date Event
2012-03-02 Obtained License
2012-06-30 Well Log Performed
2012-07-01 Surface Casing Operation Performed
2012-07-02 Direction Drilling Operation Performed - Deviate
2012-07-02 Direction Drilling Operation Performed - Horizontal
2012-07-03 Intermediate Casing Operation Performed
2012-07-05 Finished Drilling
2012-07-05 Well Log Performed
2012-07-05 Well Mode changed to Drilled and Cased
2012-07-06 Liner Casing Operation Performed
2012-07-06 Perforation Treatment Performed - Open-Hole Completion
2012-07-06 Rig Released
2012-07-21 Well Log Performed
2012-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-30 Precision Drilling Corporation 159 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-02 536.00 Deviate (5 - 79 degrees)
2012-07-02 949.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-06 Open Hole/Barefoot Completion 1966.00 1976.00 0
2012-07-23 Multi-Stage Fracture 1633.90 1634.00 0
2012-07-23 Multi-Stage Fracture 1709.50 1709.60 0
2012-07-23 Multi-Stage Fracture 1785.60 1785.70 0
2012-07-23 Multi-Stage Fracture 1861.00 1861.10 0
2012-07-23 Multi-Stage Fracture 1942.50 1942.60 0
2012-07-23 Multi-Stage Fracture 1037.30 1037.40 0
2012-07-23 Multi-Stage Fracture 1112.30 1112.40 0
2012-07-23 Multi-Stage Fracture 1185.30 1185.40 0
2012-07-23 Multi-Stage Fracture 1261.10 1261.20 0
2012-07-23 Multi-Stage Fracture 1336.40 1336.50 0
2012-07-23 Multi-Stage Fracture 1412.10 1412.20 0
2012-07-23 Multi-Stage Fracture 1485.40 1485.50 0
2012-07-23 Multi-Stage Fracture 1561.10 1561.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2847 0.0 0.0 0.0
2013 7021 0.0 0.0 0.0
2014 8685 0.0 0.0 0.0
2015 7952 0.0 0.0 0.0
2016 8529 0.0 0.0 0.0
2017 7811 0.0 0.0 0.0
2018 4934 0.0 0.0 0.0
2019 4686 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-06 No Incident Encountered 0.00 0.00
2012-08-10 No Incident Encountered 0.00 0.00

For data sources see[8]

References