X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364030803002

Well Details

Well ID: 0364030803002
Loading map...
Location: 00/03-08-036-03W4/2
Location Alias: 00/03-08-36-03 W4M
Location Alias 2: 00/03-08-036-03 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 03
Section: 08
County/Municipality: Special Areas No. 4
Well Name: ACL 3A PROVOST 3-8-36-3
Operator Name: Battle River Energy Ltd.
License Number: 0183272
License Date: 1995-12-12
License Status: Issued
Spud Date: 1995-12-28
Final Drill Date: 1995-12-30
Well Total Depth: 996.00 m
Surface Hole Latitude: 52.071798
Surface Hole Longitude: -110.400520

For data sources see[1][2]

Well History

Date Event
1995-12-12 Obtained License
1995-12-28 Surface Casing Operation Performed
1995-12-30 Drill Stem Test Performed
1995-12-30 Finished Drilling
1995-12-30 Well Log Performed
1995-12-30 Well Mode changed to Drilled and Cased
1995-12-31 Production Casing Operation Performed
1995-12-31 Rig Released
1996-01-24 Perforation Treatment Performed - Jet Perforation
1996-01-24 Well Log Performed
1996-10-17 Perforation Treatment Performed - Fractured
1999-07-05 Perforation Treatment Performed - Jet Perforation
1999-07-05 Well Mode changed to Drilled and Cased
1999-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-06 Plug Back Performed
1999-07-06 Well Log Performed
1999-07-12 Perforation Treatment Performed - Fractured
1999-10-07 Well Began Production
1999-10-07 Well Fluid changed to Gas
1999-10-07 Well Mode changed to Flowing
2007-08-03 Well Fluid changed to Gas
2007-08-03 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-24 Perforation 912.00 914.00 13
1996-10-17 Fracture 912.00 914.00 0
1999-07-05 Perforation 814.00 819.00 18
1999-07-06 Packing Device Capped w/Cement 900.00 908.00 0
1999-07-12 Fracture 814.00 819.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2173 0.0 0.0 0.0
2000 7045 0.0 0.0 0.0
2001 5386 0.0 0.0 0.0
2002 5741 0.0 0.0 0.0
2003 7957 0.0 0.0 0.0
2004 5818 0.0 0.0 0.0
2005 7612 0.0 0.0 0.0
2006 6820 0.0 0.0 0.0
2007 3624 0.0 0.0 0.0
2008 8663 0.0 0.0 0.0
2009 3336 0.0 0.0 0.0
2010 6626 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8736 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8184 0.0 0.0 0.0
2015 8400 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 5831 0.0 0.0 0.0
2018 4824 0.0 0.0 0.0
2019 6599 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References