X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364031508000

Well Details

Well ID: 0364031508000
Loading map...
Location: 00/08-15-036-03W4/0
Location Alias: 00/08-15-36-03 W4M
Location Alias 2: 00/08-15-036-03 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 03
Section: 15
County/Municipality: Special Areas No. 4
Well Name: ALTANA ET AL PROVOST 8-15-36-3
Operator Name: Altana Exploration Company
License Number: 0097672
License Date: 1982-09-30
License Status: RecCertified
Spud Date: 1982-10-20
Final Drill Date: 1982-10-22
Well Total Depth: 843.00 m
Surface Hole Latitude: 52.088899
Surface Hole Longitude: -110.343665

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-30 Obtained License
1982-10-22 Finished Drilling
1982-10-23 Drill Stem Test Performed
1982-10-24 Production Casing Operation Performed
1982-11-01 Perforation Treatment Performed - Jet Perforation
1982-11-02 Perforation Treatment Performed - Jet Perforation
1982-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-04 Perforation Treatment Performed - Jet Perforation
1982-11-04 Plug Back Performed
1982-11-04 Well Log Performed
1982-11-04 Well Mode changed to Drilled and Cased
1983-10-28 Well Began Production
1983-10-28 Well Fluid changed to Gas
1983-10-28 Well Mode changed to Flowing
1994-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-01 Perforation Treatment Performed - Jet Perforation
1994-11-01 Plug Back Performed
1994-11-01 Well Log Performed
1995-05-29 Perforation Treatment Performed - Remedial Casing
1995-05-29 Well Fluid changed to Gas
1995-05-29 Well Mode changed to Abandoned
1995-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-01 Perforation 825.50 827.00 13
1982-11-02 Perforation 825.50 827.00 13
1982-11-04 Packing Device Capped w/Cement 817.00 825.00 0
1982-11-04 Perforation 795.30 796.00 13
1994-11-01 Packing Device Capped w/Cement 780.00 788.00 0
1994-11-01 Perforation 200.00 201.00 14
1995-05-29 Remedial Casing Cementing 200.00 201.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1057 0.0 0.0 0.0
1984 923 0.0 0.0 0.0
1985 1300 0.0 0.0 0.0
1986 2061 0.0 0.0 0.0
1987 2163 0.0 0.0 0.0
1988 4405 0.0 0.0 0.0
1989 8000 0.0 0.0 0.0
1990 6498 0.0 0.0 0.0
1991 207 0.0 0.0 0.0

For data sources see[5]

References