X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364043012030

Well Details

Well ID: 0364043012030
Loading map...
Location: 03/12-30-036-04W4/0
Location Alias: 03/12-30-36-04 W4M
Location Alias 2: 03/12-30-036-04 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 04
Section: 30
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 12-30-36-4
Operator Name: Surge Energy Inc.
License Number: 0148324
License Date: 1991-03-11
License Status: Issued
Spud Date: 1991-03-20
Final Drill Date: 1991-03-22
Well Total Depth: 854.50 m
Surface Hole Latitude: 52.123641
Surface Hole Longitude: -110.574375

For data sources see[1][2]

Well History

Date Event
1991-03-11 Obtained License
1991-03-20 Surface Casing Operation Performed
1991-03-22 Finished Drilling
1991-03-22 Well Log Performed
1991-03-22 Well Mode changed to Drilled and Cased
1991-03-23 Production Casing Operation Performed
1991-03-23 Rig Released
1991-04-08 Well Log Performed
1991-04-09 Perforation Treatment Performed - Cement Squeeze
1991-04-09 Perforation Treatment Performed - Jet Perforation
1991-04-09 Well Log Performed
1991-04-11 Perforation Treatment Performed - Jet Perforation
1991-04-11 Well Log Performed
1991-04-16 Well Began Production
1991-04-16 Well Fluid changed to Crude Oil
1991-04-16 Well Mode changed to Pumping
2006-09-01 Well Fluid changed to Crude Oil
2006-09-01 Well Mode changed to Suspended
2006-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-10 Perforation Treatment Performed - Jet Perforation
2006-09-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-04-09 Perforation 835.00 836.00 19
1991-04-09 Cement Squeeze 835.00 836.00 0
1991-04-11 Perforation 829.90 831.80 19
2006-09-10 Packing Device Capped w/Cement 820.00 821.00 0
2006-09-10 Perforation 771.00 773.00 17
2006-09-10 Perforation 765.00 768.00 17
2006-09-10 Perforation 755.50 757.50 17
2006-09-12 Fracture 755.50 773.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 3548 0.0 0.0 0.0
1992 7881 0.0 0.0 0.0
1993 8013 0.0 0.0 0.0
1994 8471 0.0 0.0 0.0
1995 8365 0.0 0.0 0.0
1996 8061 0.0 0.0 0.0
1997 7563 0.0 0.0 0.0
1998 8388 0.0 0.0 0.0
1999 8489 0.0 0.0 0.0
2000 8362 0.0 0.0 0.0
2001 8662 0.0 0.0 0.0
2002 7896 0.0 0.0 0.0
2003 8246 0.0 0.0 0.0
2004 7706 0.0 0.0 0.0
2005 928 0.0 0.0 0.0

For data sources see[5]

References