If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364052502C02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.117164,"lon":-110.58672,"icon":""}]} |
| Location: C0/02-25-036-05W4/2 | |
| Location Alias: C0/02-25-36-05 W4M | |
| Location Alias 2: C0/02-25-036-05 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 05 | |
| Section: 25 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: 935247 ET AL PROVO 2-25-36-5 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0152406 | |
| License Date: 1992-05-06 | |
| License Status: Suspension | |
| Spud Date: 1992-05-09 | |
| Final Drill Date: 1992-05-12 | |
| Well Total Depth: 878.00 m | |
| Surface Hole Latitude: 52.117164 | |
| Surface Hole Longitude: -110.586720 |
| Date | Event |
|---|---|
| 1992-05-06 | Obtained License |
| 1992-05-10 | Surface Casing Operation Performed |
| 1992-05-11 | Direction Drilling Operation Performed - Deviate |
| 1992-05-12 | Finished Drilling |
| 1992-05-12 | Well Log Performed |
| 1992-05-12 | Well Mode changed to Drilled and Cased |
| 1992-05-13 | Production Casing Operation Performed |
| 1992-05-13 | Rig Released |
| 1992-05-13 | Well Log Performed |
| 1992-06-05 | Well Log Performed |
| 1992-06-07 | Perforation Treatment Performed - Jet Perforation |
| 1992-06-07 | Well Log Performed |
| 1993-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-10-04 | Plug Back Performed |
| 1993-10-05 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-20 | Well Began Injection |
| 1993-10-20 | Well Fluid changed to Water |
| 1993-10-20 | Well Type changed to Disposal |
| 1993-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-07-01 | Well Fluid changed to Water |
| 2003-07-01 | Well Mode changed to Suspended |
| 2003-07-01 | Well Type changed to Disposal |
| 2003-07-02 | Well Fluid changed to Water |
| 2003-07-02 | Well Type changed to Injection |
| 2003-07-03 | Well Fluid changed to Water |
| 2003-07-03 | Well Mode changed to Suspended |
| 2003-07-03 | Well Type changed to Injection |
| 2007-12-19 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1992-05-11 | 430.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1992-06-07 | Perforation | 854.80 | 856.30 | 19 |
| 1993-10-04 | Packing Device Capped w/Cement | 851.00 | 852.00 | 0 |
| 1993-10-05 | Perforation | 842.00 | 846.50 | 17 |
| 1993-10-25 | Acid Treatment | 842.00 | 846.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]