X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364062401C04

Well Details

Well ID: 0364062401C04
Loading map...
Location: C0/01-24-036-06W4/4
Location Alias: C0/01-24-36-06 W4M
Location Alias 2: C0/01-24-036-06 W4/04
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 06
Section: 24
County/Municipality: Special Areas No. 4
Well Name: ACL (1C) PROVOST 1-24-36-6
Operator Name: Battle River Energy Ltd.
License Number: 0138756
License Date: 1989-02-13
License Status: Issued
Spud Date: 1989-02-28
Final Drill Date: 1989-03-04
Well Total Depth: 957.00 m
Surface Hole Latitude: 52.102138
Surface Hole Longitude: -110.723995

For data sources see[1][2]

Well History

Date Event
1989-02-13 Obtained License
1989-03-01 Surface Casing Operation Performed
1989-03-04 Finished Drilling
1989-03-04 Well Log Performed
1989-03-04 Well Mode changed to Drilled and Cased
1989-03-05 Production Casing Operation Performed
1989-03-06 Rig Released
1989-03-15 Perforation Treatment Performed - Jet Perforation
1989-03-16 Perforation Treatment Performed - Fractured
1989-03-18 Perforation Treatment Performed - Jet Perforation
1989-03-19 Perforation Treatment Performed - Fractured
1993-10-04 Perforation Treatment Performed - Fractured
1993-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-07 Well Log Performed
1993-10-08 Perforation Treatment Performed - Jet Perforation
1993-10-09 Perforation Treatment Performed - Fractured
1993-10-15 Well Log Performed
1993-10-16 Perforation Treatment Performed - Jet Perforation
1993-10-16 Well Log Performed
1993-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-20 Perforation Treatment Performed - Cement Squeeze
2000-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-12 Perforation Treatment Performed - Jet Perforation
2000-08-12 Plug Back Performed
2000-08-12 Well Log Performed
2001-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-23 Perforation Treatment Performed - Jet Perforation
2001-02-23 Plug Back Performed
2001-02-23 Well Log Performed
2001-03-06 Perforation Treatment Performed - Fractured
2001-03-12 Well Began Production
2001-03-12 Well Fluid changed to Gas
2001-03-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-15 Perforation 902.00 903.00 13
1993-11-20 Acid Treatment 811.00 812.00 0
1993-11-20 Cement Squeeze 811.00 812.00 0
2000-08-12 Packing Device Capped w/Cement 847.00 855.00 0
2000-08-12 Perforation 811.00 812.00 18
2001-02-23 Packing Device Capped w/Cement 801.00 809.00 0
2001-02-23 Perforation 757.00 761.50 17
2001-03-06 Fracture 757.00 761.50 0
1989-03-16 Fracture 902.00 903.00 0
1989-03-18 Perforation 902.00 904.50 13
1989-03-19 Fracture 902.00 904.50 0
1993-10-04 Fracture 902.00 904.50 0
1993-10-07 Packing Device Capped w/Cement 882.00 890.00 0
1993-10-08 Perforation 860.20 864.00 13
1993-10-09 Fracture 860.20 864.00 0
1993-10-16 Perforation 811.00 812.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4675 0.0 0.0 0.0
2002 8305 0.0 0.0 0.0
2003 8624 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 8748 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8207 0.0 0.0 0.0
2008 8687 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8616 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8639 0.0 0.0 0.0
2018 7544 0.0 0.0 0.0
2019 8015 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References