X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364062413000

Well Details

Well ID: 0364062413000
Loading map...
Location: 00/13-24-036-06W4/0
Location Alias: 00/13-24-36-06 W4M
Location Alias 2: 00/13-24-036-06 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 06
Section: 24
County/Municipality: Special Areas No. 4
Well Name: FCPI PROVOST 13-24-36-6
Operator Name: NS Industries Canada Limited
License Number: 0036758
License Date: 1969-08-26
License Status: RecCertified
Spud Date: 1969-08-29
Final Drill Date: 1969-08-31
Well Total Depth: 757.10 m
Surface Hole Latitude: 52.111641
Surface Hole Longitude: -110.741336

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-26 Obtained License
1969-08-31 Finished Drilling
1969-08-31 Well Mode changed to Drilled and Cased
1969-09-01 Production Casing Operation Performed
1969-09-14 Perforation Treatment Performed - Acid Wash - No Pressure
1969-09-14 Perforation Treatment Performed - Fractured
1969-09-14 Perforation Treatment Performed - Jet Perforation
1969-12-06 Well Began Production
1969-12-06 Well Fluid changed to Gas
1969-12-06 Well Mode changed to Flowing
1976-09-21 Perforation Treatment Performed - Alcohol Squeeze
1992-10-01 Well Fluid changed to Gas
1992-10-01 Well Mode changed to Suspended
1996-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-28 Perforation Treatment Performed - Jet Perforation
1996-06-28 Plug Back Performed
1996-07-02 Perforation Treatment Performed - Remedial Casing
1996-07-09 Well Abandoned
1996-07-09 Well Fluid changed to Gas
1996-07-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-14 Perforation 735.50 738.20 7
1969-09-14 Acid Wash 735.50 738.20 0
1969-09-14 Fracture 735.50 738.20 0
1976-09-21 Alchohol Squeeze 735.50 738.20 0
1996-06-28 Packing Device Capped w/Cement 722.00 730.00 0
1996-06-28 Perforation 224.00 225.00 13
1996-07-02 Remedial Casing Cementing 224.00 225.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 627 0.0 0.0 0.0
1970 7941 0.0 0.0 0.0
1971 6936 0.0 0.0 0.0
1972 5124 0.0 0.0 0.0
1973 7527 0.0 0.0 0.0
1974 5824 0.0 0.0 0.0
1975 7573 0.0 0.0 0.0
1976 3572 0.0 0.0 0.0
1977 997 0.0 0.0 0.0
1978 3724 0.0 0.0 0.0
1979 7041 0.0 0.0 0.0
1980 6810 0.0 0.0 0.0
1981 6905 0.0 0.0 0.0
1982 8634 0.0 0.0 0.0
1983 8538 0.0 0.0 0.0
1984 8307 0.0 0.0 0.0
1985 8012 0.0 0.0 0.0
1986 8025 0.0 0.0 0.0
1987 7017 0.0 0.0 0.0
1988 4835 0.0 0.0 0.0
1989 8161 0.0 0.0 0.0
1990 7761 0.0 0.0 0.0
1991 6702 0.0 0.0 0.0
1992 4884 0.0 0.0 0.0

For data sources see[5]

References