X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364071607000

Well Details

Well ID: 0364071607000
Loading map...
Location: 00/07-16-036-07W4/0
Location Alias: 00/07-16-36-07 W4M
Location Alias 2: 00/07-16-036-07 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 07
Section: 16
County/Municipality: Special Areas No. 4
Well Name: SOC PROVOST 7-16-36-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0148638
License Date: 1991-04-18
License Status: Abandoned
Spud Date: 1991-05-18
Final Drill Date: 1991-05-21
Well Total Depth: 1001.00 m
Surface Hole Latitude: 52.090603
Surface Hole Longitude: -110.939983

For data sources see[1][2]

Well History

Date Event
1991-04-18 Obtained License
1991-05-19 Surface Casing Operation Performed
1991-05-21 Drill Stem Test Performed
1991-05-21 Finished Drilling
1991-05-21 Well Log Performed
1991-05-21 Well Mode changed to Drilled and Cased
1991-05-22 Drill Stem Test Performed
1991-05-23 Production Casing Operation Performed
1991-05-23 Rig Released
1991-05-26 Perforation Treatment Performed - Jet Perforation
1991-05-29 Well Began Production
1991-05-29 Well Fluid changed to Crude Oil
1991-05-29 Well Mode changed to Pumping
1991-07-11 Perforation Treatment Performed - Jet Perforation
1991-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-12 Perforation Treatment Performed - Cement Squeeze
1991-07-14 Perforation Treatment Performed - Jet Perforation
1991-10-07 Perforation Treatment Performed - Cement Squeeze
1991-10-08 Perforation Treatment Performed - Jet Perforation
1991-10-08 Well Log Performed
1991-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-01 Well Fluid changed to Crude Oil
1992-04-01 Well Mode changed to Suspended
1994-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-04 Plug Back Performed
1994-05-04 Well Abandoned
1994-05-04 Well Fluid changed to Crude Oil
1994-05-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-05-26 Perforation 949.00 951.50 13
1994-05-04 Packing Device Capped w/Cement 951.00 959.00 0
1991-07-11 Perforation 955.00 956.00 13
1991-07-12 Acid Treatment 949.00 956.00 0
1991-07-12 Cement Squeeze 949.00 956.00 0
1991-07-14 Perforation 949.00 951.50 13
1991-10-07 Cement Squeeze 949.00 951.50 0
1991-10-08 Perforation 964.50 969.50 13
1991-10-10 Acid Treatment 964.50 969.50 0
1992-01-08 Acid Treatment 964.50 969.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1666 0.0 0.0 0.0

For data sources see[5]

References