If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364073506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.13483,"lon":-110.90211,"icon":""}]} |
Location: 00/06-35-036-07W4/0 | |
Location Alias: 00/06-35-36-07 W4M | |
Location Alias 2: 00/06-35-036-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 07 | |
Section: 35 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL PROVOST 6-35-36-7 | |
Operator Name: Aeraden Energy Corp. | |
License Number: 0153837 | |
License Date: 1992-09-24 | |
License Status: Abandoned | |
Spud Date: 1992-10-04 | |
Final Drill Date: 1992-10-07 | |
Well Total Depth: 984.00 m | |
Surface Hole Latitude: 52.134830 | |
Surface Hole Longitude: -110.902110 |
Date | Event |
---|---|
1992-09-24 | Obtained License |
1992-10-05 | Surface Casing Operation Performed |
1992-10-07 | Finished Drilling |
1992-10-07 | Well Log Performed |
1992-10-07 | Well Mode changed to Drilled and Cased |
1992-10-08 | Production Casing Operation Performed |
1992-10-08 | Rig Released |
1992-12-11 | Well Log Performed |
1993-01-08 | Perforation Treatment Performed - Jet Perforation |
1993-01-23 | Well Began Production |
1993-01-23 | Well Fluid changed to Crude Oil |
1993-01-23 | Well Mode changed to Pumping |
1993-07-21 | Perforation Treatment Performed - Cement Squeeze |
1993-07-21 | Well Fluid changed to Crude Oil |
1993-07-21 | Well Mode changed to Suspended |
1993-07-24 | Perforation Treatment Performed - Jet Perforation |
1993-07-24 | Well Log Performed |
1993-07-29 | Well Began Injection |
1993-07-29 | Well Fluid changed to Water |
1993-07-29 | Well Type changed to Disposal |
2000-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-02-27 | Perforation Treatment Performed - Jet Perforation |
2000-02-27 | Plug Back Performed |
2000-02-27 | Well Fluid changed to Water |
2000-02-27 | Well Log Performed |
2000-02-27 | Well Mode changed to Abandoned Zone |
2000-02-27 | Well Type changed to Disposal |
2000-03-07 | Perforation Treatment Performed - Fractured |
2000-04-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-04-12 | Plug Back Performed |
2011-10-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-01-08 | Perforation | 949.00 | 952.50 | 13 |
1993-07-21 | Cement Squeeze | 949.00 | 952.50 | 0 |
1993-07-24 | Perforation | 962.00 | 970.00 | 17 |
2000-02-27 | Packing Device Capped w/Cement | 937.00 | 945.00 | 0 |
2000-02-27 | Perforation | 793.00 | 795.00 | 18 |
2000-03-07 | Fracture | 793.00 | 795.00 | 0 |
2000-04-12 | Packing Device Capped w/Cement | 777.80 | 785.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 525 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]