X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364100416020

Well Details

Well ID: 0364100416020
Loading map...
Location: 02/16-04-036-10W4/0
Location Alias: 02/16-04-36-10 W4M
Location Alias 2: 02/16-04-036-10 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 04
County/Municipality: County of Paintearth No. 18
Well Name: TORO 102 HZ PROVOST 16-4-36-10
Operator Name: Steelhead Petroleum Ltd.
License Number: 0475931
License Date: 2015-06-29
License Status: Issued
Spud Date: 2015-07-15
Final Drill Date: 2015-07-18
Well Total Depth: 2014.00 m
Surface Hole Latitude: 52.060995
Surface Hole Longitude: -111.376588

For data sources see[1][2]

Well History

Date Event
2015-06-29 Obtained License
2015-07-15 Surface Casing Operation Performed
2015-07-16 Direction Drilling Operation Performed - Deviate
2015-07-16 Direction Drilling Operation Performed - Horizontal
2015-07-17 Well Log Performed
2015-07-18 Finished Drilling
2015-07-18 Production Casing Operation Performed
2015-07-18 Rig Released
2015-07-18 Well Mode changed to Drilled and Cased
2015-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-17 Well Began Production
2015-08-17 Well Fluid changed to Crude Oil
2015-08-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-15 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-16 690.60 Deviate (5 - 79 degrees)
2015-07-16 995.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-30 Multi-Stage Fracture 1996.20 1996.50 0
2015-07-30 Multi-Stage Fracture 1643.80 1644.10 0
2015-07-30 Multi-Stage Fracture 1603.20 1603.50 0
2015-07-30 Multi-Stage Fracture 1562.50 1562.80 0
2015-07-30 Multi-Stage Fracture 1521.90 1522.20 0
2015-07-30 Multi-Stage Fracture 1481.20 1481.50 0
2015-07-30 Multi-Stage Fracture 1440.60 1440.90 0
2015-07-30 Multi-Stage Fracture 1399.90 1400.20 0
2015-07-30 Multi-Stage Fracture 1359.30 1359.60 0
2015-07-30 Multi-Stage Fracture 1318.60 1318.90 0
2015-07-30 Multi-Stage Fracture 1278.00 1278.30 0
2015-07-30 Multi-Stage Fracture 1955.50 1955.80 0
2015-07-30 Multi-Stage Fracture 1237.30 1237.60 0
2015-07-30 Multi-Stage Fracture 1196.60 1196.90 0
2015-07-30 Multi-Stage Fracture 1156.00 1156.30 0
2015-07-30 Multi-Stage Fracture 1115.30 1115.60 0
2015-07-30 Multi-Stage Fracture 1074.70 1075.00 0
2015-07-30 Multi-Stage Fracture 1047.50 1047.80 0
2015-07-30 Multi-Stage Fracture 1914.90 1915.20 0
2015-07-30 Multi-Stage Fracture 1874.30 1874.60 0
2015-07-30 Multi-Stage Fracture 1833.60 1833.90 0
2015-07-30 Multi-Stage Fracture 1793.00 1793.30 0
2015-07-30 Multi-Stage Fracture 1753.40 1753.70 0
2015-07-30 Multi-Stage Fracture 1711.70 1712.00 0
2015-07-30 Multi-Stage Fracture 1671.00 1671.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-30 2015-07-30 891 1,060 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 100 N/A
Sand Canfrac Sands Ltd. silica crystalline 14808-60-7 100 12.3071 N/A
Myacide 2K7 BASF Bactericide/Biocide Bronopol 52-51-7 100 0.005 N/A
CC2 Weatherford Clay Control Choline chloride 67-48-1 100 0.4 N/A
Water Not Available 100 0.4 N/A
NE2 Weatherford Demulsifier Methanol 67-56-1 100 0.1 N/A
Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio
l
52624-57-4 100 0.1 N/A
Propanetriol polymer with propylene oxide-ethylene oxide 9082-00-2 100 0.1 N/A
Water Not Available 100 0.1 N/A
FR5 SNF Friction Reducer 2-Propenoic acid. polymer with 2-propenamide. sodium salt 25987-30-8 100 0.13 N/A
Acrylamide (residual) 79-06-1 100 0.13 N/A
Alcohols. C11-14-iso-.C13-rich. ethoxylated 78330-21-9 100 0.13 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.13 N/A
Sodium acetate 126-96-5 100 0.13 N/A
Sorbitan monooleale 1338-43-8 100 0.13 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.13 N/A
Water Not Available 100 0.13 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-30 2015-07-30 Surface Water - Runoff 1072

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2606 0.0 0.0 0.0
2016 7385 0.0 0.0 0.0
2017 6876 0.0 0.0 0.0
2018 8419 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2064 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References