If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364100416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.060995,"lon":-111.376588,"icon":""}]} |
| Location: 02/16-04-036-10W4/0 | |
| Location Alias: 02/16-04-36-10 W4M | |
| Location Alias 2: 02/16-04-036-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 04 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: TORO 102 HZ PROVOST 16-4-36-10 | |
| Operator Name: Steelhead Petroleum Ltd. | |
| License Number: 0475931 | |
| License Date: 2015-06-29 | |
| License Status: Issued | |
| Spud Date: 2015-07-15 | |
| Final Drill Date: 2015-07-18 | |
| Well Total Depth: 2014.00 m | |
| Surface Hole Latitude: 52.060995 | |
| Surface Hole Longitude: -111.376588 |
| Date | Event |
|---|---|
| 2015-06-29 | Obtained License |
| 2015-07-15 | Surface Casing Operation Performed |
| 2015-07-16 | Direction Drilling Operation Performed - Deviate |
| 2015-07-16 | Direction Drilling Operation Performed - Horizontal |
| 2015-07-17 | Well Log Performed |
| 2015-07-18 | Finished Drilling |
| 2015-07-18 | Production Casing Operation Performed |
| 2015-07-18 | Rig Released |
| 2015-07-18 | Well Mode changed to Drilled and Cased |
| 2015-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-08-17 | Well Began Production |
| 2015-08-17 | Well Fluid changed to Crude Oil |
| 2015-08-17 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-07-15 | Ensign Drilling Inc. | 348 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-07-16 | 690.60 | Deviate (5 - 79 degrees) |
| 2015-07-16 | 995.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-07-30 | Multi-Stage Fracture | 1996.20 | 1996.50 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1643.80 | 1644.10 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1603.20 | 1603.50 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1562.50 | 1562.80 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1521.90 | 1522.20 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1481.20 | 1481.50 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1440.60 | 1440.90 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1399.90 | 1400.20 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1359.30 | 1359.60 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1318.60 | 1318.90 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1278.00 | 1278.30 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1955.50 | 1955.80 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1237.30 | 1237.60 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1196.60 | 1196.90 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1156.00 | 1156.30 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1115.30 | 1115.60 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1074.70 | 1075.00 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1047.50 | 1047.80 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1914.90 | 1915.20 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1874.30 | 1874.60 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1833.60 | 1833.90 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1793.00 | 1793.30 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1753.40 | 1753.70 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1711.70 | 1712.00 | 0 |
| 2015-07-30 | Multi-Stage Fracture | 1671.00 | 1671.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-07-30 | 2015-07-30 | 891 | 1,060 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 100 | N/A | |||
| Sand | Canfrac Sands Ltd. | silica crystalline | 14808-60-7 | 100 | 12.3071 | N/A | ||
| Myacide 2K7 | BASF | Bactericide/Biocide | Bronopol | 52-51-7 | 100 | 0.005 | N/A | |
| CC2 | Weatherford | Clay Control | Choline chloride | 67-48-1 | 100 | 0.4 | N/A | |
| Water | Not Available | 100 | 0.4 | N/A | ||||
| NE2 | Weatherford | Demulsifier | Methanol | 67-56-1 | 100 | 0.1 | N/A | |
| Oxirane-methyl-polymer-ether-ethyl-hydroxymethyl-propanedio l |
52624-57-4 | 100 | 0.1 | N/A | ||||
| Propanetriol polymer with propylene oxide-ethylene oxide | 9082-00-2 | 100 | 0.1 | N/A | ||||
| Water | Not Available | 100 | 0.1 | N/A | ||||
| FR5 | SNF | Friction Reducer | 2-Propenoic acid. polymer with 2-propenamide. sodium salt | 25987-30-8 | 100 | 0.13 | N/A | |
| Acrylamide (residual) | 79-06-1 | 100 | 0.13 | N/A | ||||
| Alcohols. C11-14-iso-.C13-rich. ethoxylated | 78330-21-9 | 100 | 0.13 | N/A | ||||
| Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.13 | N/A | ||||
| Sodium acetate | 126-96-5 | 100 | 0.13 | N/A | ||||
| Sorbitan monooleale | 1338-43-8 | 100 | 0.13 | N/A | ||||
| Sorbitan monooleate. ethoxylated | 9005-65-6 | 100 | 0.13 | N/A | ||||
| Water | Not Available | 100 | 0.13 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-07-30 | 2015-07-30 | Surface Water - Runoff | 1072 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 2606 | 0.0 | 0.0 | 0.0 |
| 2016 | 7385 | 0.0 | 0.0 | 0.0 |
| 2017 | 6876 | 0.0 | 0.0 | 0.0 |
| 2018 | 8419 | 0.0 | 0.0 | 0.0 |
| 2019 | 8577 | 0.0 | 0.0 | 0.0 |
| 2020 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-07-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]