X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364100616000

Well Details

Well ID: 0364100616000
Loading map...
Location: 00/16-06-036-10W4/0
Location Alias: 00/16-06-36-10 W4M
Location Alias 2: 00/16-06-036-10 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 06
County/Municipality: County of Paintearth No. 18
Well Name: KALLISTO PROVOST 16-6-36-10
Operator Name: Steelhead Petroleum Ltd.
License Number: 0093409
License Date: 1981-11-19
License Status: Suspension
Spud Date: 1981-11-23
Final Drill Date: 1981-11-26
Well Total Depth: 925.00 m
Surface Hole Latitude: 52.068445
Surface Hole Longitude: -111.411755

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-19 Obtained License
1981-11-23 Lost Circulation Occurred
1981-11-26 Finished Drilling
1981-11-26 Well Mode changed to Drilled and Cased
1981-11-27 Production Casing Operation Performed
1981-11-30 Perforation Treatment Performed - Jet Perforation
1981-12-01 Well Began Production
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Flowing
1981-12-10 Perforation Treatment Performed - Fractured
1989-07-24 Well Fluid changed to Crude Oil
1989-07-24 Well Mode changed to Pumping
2000-09-08 Perforation Treatment Performed - Jet Perforation
2000-09-08 Well Log Performed
2000-09-15 Well Log Performed
2000-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-18 Perforation Treatment Performed - Jet Perforation
2000-09-18 Plug Back Performed
2000-09-18 Well Fluid changed to Crude Oil
2000-09-18 Well Mode changed to Abandoned Zone
2000-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-05 Perforation Treatment Performed - Jet Perforation
2000-10-05 Plug Back Performed
2000-10-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-30 Perforation 898.00 900.00 13
1981-12-10 Fracture 898.00 900.00 0
2000-09-08 Perforation 889.00 891.00 17
2000-09-08 Perforation 886.80 889.00 17
2000-09-18 Packing Device Capped w/Cement 872.00 880.00 0
2000-09-18 Perforation 236.00 239.00 17
2000-10-05 Packing Device Capped w/Cement 217.00 225.00 0
2000-10-05 Perforation 176.00 177.80 17
2000-10-05 Perforation 174.00 176.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 591 0.0 0.0 0.0
1982 8656 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8699 0.0 0.0 0.0
1986 8543 0.0 0.0 0.0
1987 8663 0.0 0.0 0.0
1988 8775 0.0 0.0 0.0
1989 8145 0.0 0.0 0.0
1990 8446 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8639 0.0 0.0 0.0
1994 8579 0.0 0.0 0.0
1995 8745 0.0 0.0 0.0
1996 8771 0.0 0.0 0.0
1997 4491 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-11-23 Lost Circulation 55.00 55.00

For data sources see[6]

References