X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364100616003

Well Details

Well ID: 0364100616003
Loading map...
Location: 00/16-06-036-10W4/3
Location Alias: 00/16-06-36-10 W4M
Location Alias 2: 00/16-06-036-10 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 06
County/Municipality: County of Paintearth No. 18
Well Name: KALLISTO PROVOST 16-6-36-10
Operator Name: Steelhead Petroleum Ltd.
License Number: 0093409
License Date: 1981-11-19
License Status: Suspension
Spud Date: 1981-11-23
Final Drill Date: 1981-11-26
Well Total Depth: 925.00 m
Surface Hole Latitude: 52.068445
Surface Hole Longitude: -111.411755

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-19 Obtained License
1981-11-23 Lost Circulation Occurred
1981-11-26 Finished Drilling
1981-11-26 Well Mode changed to Drilled and Cased
1981-11-27 Production Casing Operation Performed
1981-11-30 Perforation Treatment Performed - Jet Perforation
1981-12-10 Perforation Treatment Performed - Fractured
2000-09-08 Perforation Treatment Performed - Jet Perforation
2000-09-08 Well Log Performed
2000-09-15 Well Log Performed
2000-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-18 Perforation Treatment Performed - Jet Perforation
2000-09-18 Plug Back Performed
2000-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-05 Perforation Treatment Performed - Jet Perforation
2000-10-05 Plug Back Performed
2000-10-05 Well Log Performed
2000-10-26 Well Began Production
2000-10-26 Well Fluid changed to Gas
2000-10-26 Well Mode changed to Flowing
2017-12-01 Well Fluid changed to Gas
2017-12-01 Well Mode changed to Suspended
2019-06-01 Well Fluid changed to Gas
2019-06-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-30 Perforation 898.00 900.00 13
1981-12-10 Fracture 898.00 900.00 0
2000-09-08 Perforation 889.00 891.00 17
2000-09-08 Perforation 886.80 889.00 17
2000-09-18 Packing Device Capped w/Cement 872.00 880.00 0
2000-09-18 Perforation 236.00 239.00 17
2000-10-05 Packing Device Capped w/Cement 217.00 225.00 0
2000-10-05 Perforation 176.00 177.80 17
2000-10-05 Perforation 174.00 176.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1604 0.0 0.0 0.0
2001 8519 0.0 0.0 0.0
2002 6441 0.0 0.0 0.0
2003 6907 0.0 0.0 0.0
2004 8524 0.0 0.0 0.0
2005 8332 0.0 0.0 0.0
2006 8321 0.0 0.0 0.0
2007 7082 0.0 0.0 0.0
2008 7161 0.0 0.0 0.0
2009 6762 0.0 0.0 0.0
2010 8296 0.0 0.0 0.0
2011 8679 0.0 0.0 0.0
2012 8754 0.0 0.0 0.0
2013 8726 0.0 0.0 0.0
2014 5765 0.0 0.0 0.0
2015 8737 0.0 0.0 0.0
2016 7970 0.0 0.0 0.0
2019 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-11-23 Lost Circulation 55.00 55.00

For data sources see[6]

References