X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364122516000

Well Details

Well ID: 0364122516000
Loading map...
Location: 00/16-25-036-12W4/0
Location Alias: 00/16-25-36-12 W4M
Location Alias 2: 00/16-25-036-12 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 12
Section: 25
County/Municipality: County of Paintearth No. 18
Well Name: TORO HZ PROVOST 16-25-36-12
Operator Name: Steelhead Petroleum Ltd.
License Number: 0484375
License Date: 2017-07-06
License Status: Issued
Spud Date: 2017-08-10
Final Drill Date: 2017-08-13
Well Total Depth: 2651.00 m
Surface Hole Latitude: 52.118090
Surface Hole Longitude: -111.599101

For data sources see[1][2]

Well History

Date Event
2017-07-06 Obtained License
2017-08-10 Surface Casing Operation Performed
2017-08-11 Direction Drilling Operation Performed - Deviate
2017-08-11 Direction Drilling Operation Performed - Horizontal
2017-08-13 Finished Drilling
2017-08-13 Production Casing Operation Performed
2017-08-13 Well Log Performed
2017-08-13 Well Mode changed to Drilled and Cased
2017-08-14 Rig Released
2017-08-19 Well Log Performed
2017-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-30 Well Began Production
2017-09-30 Well Fluid changed to Crude Oil
2017-09-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-10 Bonanza Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-11 590.40 Deviate (5 - 79 degrees)
2017-08-11 1035.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-12 Multi-Stage Fracture 2621.30 2621.40 0
2017-09-12 Multi-Stage Fracture 2237.70 2237.80 0
2017-09-12 Multi-Stage Fracture 2194.70 2194.80 0
2017-09-12 Multi-Stage Fracture 2151.80 2151.90 0
2017-09-12 Multi-Stage Fracture 2108.90 2109.00 0
2017-09-12 Multi-Stage Fracture 2066.10 2066.20 0
2017-09-12 Multi-Stage Fracture 2023.70 2023.80 0
2017-09-12 Multi-Stage Fracture 1980.70 1980.80 0
2017-09-12 Multi-Stage Fracture 1937.70 1937.80 0
2017-09-12 Multi-Stage Fracture 1894.70 1894.80 0
2017-09-12 Multi-Stage Fracture 1851.80 1851.90 0
2017-09-12 Multi-Stage Fracture 2580.00 2580.10 0
2017-09-12 Multi-Stage Fracture 1809.00 1809.10 0
2017-09-12 Multi-Stage Fracture 1766.30 1766.40 0
2017-09-12 Multi-Stage Fracture 1723.30 1723.40 0
2017-09-12 Multi-Stage Fracture 1680.50 1680.60 0
2017-09-13 Multi-Stage Fracture 1637.80 1637.90 0
2017-09-13 Multi-Stage Fracture 1595.00 1595.10 0
2017-09-13 Multi-Stage Fracture 1552.00 1552.10 0
2017-09-13 Multi-Stage Fracture 1509.10 1509.20 0
2017-09-13 Multi-Stage Fracture 1466.10 1466.20 0
2017-09-13 Multi-Stage Fracture 1423.40 1423.50 0
2017-09-12 Multi-Stage Fracture 2537.40 2537.50 0
2017-09-13 Multi-Stage Fracture 1380.40 1380.50 0
2017-09-13 Multi-Stage Fracture 1337.90 1338.00 0
2017-09-13 Multi-Stage Fracture 1294.90 1295.00 0
2017-09-13 Multi-Stage Fracture 1251.90 1252.00 0
2017-09-13 Multi-Stage Fracture 1209.20 1209.30 0
2017-09-13 Multi-Stage Fracture 1166.50 1166.60 0
2017-09-13 Multi-Stage Fracture 1123.70 1123.80 0
2017-09-13 Multi-Stage Fracture 1080.80 1080.90 0
2017-09-12 Multi-Stage Fracture 2494.60 2494.70 0
2017-09-12 Multi-Stage Fracture 2451.60 2451.70 0
2017-09-12 Multi-Stage Fracture 2408.90 2409.00 0
2017-09-12 Multi-Stage Fracture 2365.80 2365.90 0
2017-09-12 Multi-Stage Fracture 2323.00 2323.10 0
2017-09-12 Multi-Stage Fracture 2280.40 2280.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-12 2017-09-13 918 1,485 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 76.3857 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 11.4663 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0536 N/A
water 7732-18-5 100 0.0536 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0583 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.0808 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1305 N/A
Ethylene glycol 107-21-1 100 0.1305 N/A
Potassium Carbonate 584-08-7 100 0.1305 N/A
Potassium Hydroxide 1310-58-3 100 0.1305 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2888 N/A
IH-NS-2 Fusion Technologies Inc. Surfactant Citrus Terpenes 68647-72-3 100 0.0693 N/A
Isopropyl Alcohol 67-63-0 100 0.0693 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-24 2017-08-24 Surface Water - Lake 473

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2171 0.0 0.0 0.0
2018 6982 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-14 No Incident Encountered 0.00 0.00
2017-09-13 No Incident Encountered 0.00 0.00
2018-02-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References