If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202001020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.101991,"lon":-112.815323,"icon":""}]} |
Location: 02/01-20-036-20W4/0 | |
Location Alias: 02/01-20-36-20 W4M | |
Location Alias 2: 02/01-20-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 102 FENNW 1-20-36-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0436798 | |
License Date: 2011-09-14 | |
License Status: Issued | |
Spud Date: 2011-09-24 | |
Final Drill Date: 2011-09-26 | |
Well Total Depth: 723.00 m | |
Surface Hole Latitude: 52.101991 | |
Surface Hole Longitude: -112.815323 |
Date | Event |
---|---|
2011-09-14 | Obtained License |
2011-09-25 | Surface Casing Operation Performed |
2011-09-26 | Finished Drilling |
2011-09-26 | Production Casing Operation Performed |
2011-09-26 | Well Mode changed to Drilled and Cased |
2011-09-27 | Rig Released |
2011-10-06 | Well Log Performed |
2012-04-18 | Perforation Treatment Performed - Jet Perforation |
2013-10-01 | Well Began Production |
2013-10-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-10-01 | Well Mode changed to Flowing |
2013-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-04-18 | Perforation | 384.70 | 386.20 | 13 |
2012-04-18 | Perforation | 298.50 | 300.50 | 13 |
2012-04-18 | Perforation | 292.50 | 295.50 | 13 |
2012-04-18 | Perforation | 284.20 | 285.20 | 13 |
2012-04-18 | Perforation | 281.20 | 283.20 | 13 |
2012-04-18 | Perforation | 251.80 | 253.30 | 13 |
2012-04-18 | Perforation | 242.50 | 243.50 | 13 |
2012-04-18 | Perforation | 239.50 | 240.50 | 13 |
2012-04-18 | Perforation | 237.00 | 239.00 | 13 |
2013-10-16 | Multi-Stage Fracture | 384.70 | 386.20 | 0 |
2013-10-16 | Multi-Stage Fracture | 378.50 | 380.00 | 0 |
2012-04-18 | Perforation | 378.50 | 380.00 | 13 |
2013-10-16 | Multi-Stage Fracture | 367.50 | 369.00 | 0 |
2013-10-16 | Multi-Stage Fracture | 336.80 | 338.80 | 0 |
2013-10-16 | Multi-Stage Fracture | 331.50 | 334.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 326.00 | 328.00 | 0 |
2013-10-16 | Multi-Stage Fracture | 315.00 | 318.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 312.50 | 313.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 306.00 | 310.00 | 0 |
2013-10-16 | Multi-Stage Fracture | 298.50 | 300.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 292.50 | 295.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 284.20 | 285.20 | 0 |
2012-04-18 | Perforation | 367.50 | 369.00 | 13 |
2013-10-16 | Multi-Stage Fracture | 251.80 | 253.30 | 0 |
2013-10-16 | Multi-Stage Fracture | 242.50 | 243.50 | 0 |
2013-10-16 | Multi-Stage Fracture | 239.50 | 240.50 | 0 |
2012-04-18 | Perforation | 336.80 | 338.80 | 13 |
2012-04-18 | Perforation | 331.50 | 334.50 | 13 |
2012-04-18 | Perforation | 326.00 | 328.00 | 13 |
2012-04-18 | Perforation | 315.00 | 318.50 | 13 |
2012-04-18 | Perforation | 312.50 | 313.50 | 13 |
2012-04-18 | Perforation | 306.00 | 310.00 | 13 |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-16 | 2013-10-16 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 938 | 0.0 | 0.0 | 0.0 |
2014 | 8518 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8423 | 0.0 | 0.0 | 0.0 |
2017 | 6466 | 0.0 | 0.0 | 0.0 |
2018 | 4921 | 0.0 | 0.0 | 0.0 |
2019 | 5877 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-18 | No Incident Encountered | 0.00 | 0.00 |
2013-10-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]