If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364202001020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.101991,"lon":-112.815323,"icon":""}]} |
| Location: 02/01-20-036-20W4/0 | |
| Location Alias: 02/01-20-36-20 W4M | |
| Location Alias 2: 02/01-20-036-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 20 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: BEARSPAW 102 FENNW 1-20-36-20 | |
| Operator Name: Bearspaw Petroleum Ltd. | |
| License Number: 0436798 | |
| License Date: 2011-09-14 | |
| License Status: Issued | |
| Spud Date: 2011-09-24 | |
| Final Drill Date: 2011-09-26 | |
| Well Total Depth: 723.00 m | |
| Surface Hole Latitude: 52.101991 | |
| Surface Hole Longitude: -112.815323 |
| Date | Event |
|---|---|
| 2011-09-14 | Obtained License |
| 2011-09-25 | Surface Casing Operation Performed |
| 2011-09-26 | Finished Drilling |
| 2011-09-26 | Production Casing Operation Performed |
| 2011-09-26 | Well Mode changed to Drilled and Cased |
| 2011-09-27 | Rig Released |
| 2011-10-06 | Well Log Performed |
| 2012-04-18 | Perforation Treatment Performed - Jet Perforation |
| 2013-10-01 | Well Began Production |
| 2013-10-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2013-10-01 | Well Mode changed to Flowing |
| 2013-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-04-18 | Perforation | 384.70 | 386.20 | 13 |
| 2012-04-18 | Perforation | 298.50 | 300.50 | 13 |
| 2012-04-18 | Perforation | 292.50 | 295.50 | 13 |
| 2012-04-18 | Perforation | 284.20 | 285.20 | 13 |
| 2012-04-18 | Perforation | 281.20 | 283.20 | 13 |
| 2012-04-18 | Perforation | 251.80 | 253.30 | 13 |
| 2012-04-18 | Perforation | 242.50 | 243.50 | 13 |
| 2012-04-18 | Perforation | 239.50 | 240.50 | 13 |
| 2012-04-18 | Perforation | 237.00 | 239.00 | 13 |
| 2013-10-16 | Multi-Stage Fracture | 384.70 | 386.20 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 378.50 | 380.00 | 0 |
| 2012-04-18 | Perforation | 378.50 | 380.00 | 13 |
| 2013-10-16 | Multi-Stage Fracture | 367.50 | 369.00 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 336.80 | 338.80 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 331.50 | 334.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 326.00 | 328.00 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 315.00 | 318.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 312.50 | 313.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 306.00 | 310.00 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 298.50 | 300.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 292.50 | 295.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 284.20 | 285.20 | 0 |
| 2012-04-18 | Perforation | 367.50 | 369.00 | 13 |
| 2013-10-16 | Multi-Stage Fracture | 251.80 | 253.30 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 242.50 | 243.50 | 0 |
| 2013-10-16 | Multi-Stage Fracture | 239.50 | 240.50 | 0 |
| 2012-04-18 | Perforation | 336.80 | 338.80 | 13 |
| 2012-04-18 | Perforation | 331.50 | 334.50 | 13 |
| 2012-04-18 | Perforation | 326.00 | 328.00 | 13 |
| 2012-04-18 | Perforation | 315.00 | 318.50 | 13 |
| 2012-04-18 | Perforation | 312.50 | 313.50 | 13 |
| 2012-04-18 | Perforation | 306.00 | 310.00 | 13 |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-10-16 | 2013-10-16 | N/A | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 938 | 0.0 | 0.0 | 0.0 |
| 2014 | 8518 | 0.0 | 0.0 | 0.0 |
| 2015 | 8679 | 0.0 | 0.0 | 0.0 |
| 2016 | 8423 | 0.0 | 0.0 | 0.0 |
| 2017 | 6466 | 0.0 | 0.0 | 0.0 |
| 2018 | 4921 | 0.0 | 0.0 | 0.0 |
| 2019 | 5877 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-04-18 | No Incident Encountered | 0.00 | 0.00 |
| 2013-10-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]