If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202003030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.103612,"lon":-112.82609,"icon":""}]} |
Location: 03/03-20-036-20W4/0 | |
Location Alias: 03/03-20-36-20 W4M | |
Location Alias 2: 03/03-20-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 103 FENNW 3-20-36-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0436111 | |
License Date: 2011-08-17 | |
License Status: Issued | |
Spud Date: 2011-10-23 | |
Final Drill Date: 2011-10-26 | |
Well Total Depth: 836.00 m | |
Surface Hole Latitude: 52.103612 | |
Surface Hole Longitude: -112.826090 |
Date | Event |
---|---|
2011-08-17 | Obtained License |
2011-10-24 | Direction Drilling Operation Performed - Deviate |
2011-10-24 | Surface Casing Operation Performed |
2011-10-26 | Finished Drilling |
2011-10-26 | Production Casing Operation Performed |
2011-10-26 | Well Mode changed to Drilled and Cased |
2011-10-27 | Rig Released |
2011-11-16 | Well Log Performed |
2012-05-10 | Perforation Treatment Performed - Jet Perforation |
2013-11-01 | Well Began Production |
2013-11-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-11-01 | Well Mode changed to Flowing |
2013-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-24 | 107.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-10 | Perforation | 450.70 | 451.70 | 13 |
2012-05-10 | Perforation | 366.70 | 367.20 | 13 |
2012-05-10 | Perforation | 361.00 | 363.00 | 13 |
2012-05-10 | Perforation | 358.00 | 360.00 | 13 |
2012-05-10 | Perforation | 350.00 | 351.50 | 13 |
2012-05-10 | Perforation | 343.70 | 347.20 | 13 |
2012-05-10 | Perforation | 338.70 | 339.70 | 13 |
2012-05-10 | Perforation | 336.20 | 338.20 | 13 |
2012-05-10 | Perforation | 310.00 | 312.00 | 13 |
2012-05-10 | Perforation | 300.70 | 301.70 | 13 |
2012-05-10 | Perforation | 297.00 | 298.00 | 13 |
2012-05-10 | Perforation | 444.00 | 445.50 | 13 |
2012-05-10 | Perforation | 286.50 | 288.00 | 13 |
2012-05-10 | Perforation | 282.20 | 285.20 | 13 |
2012-05-10 | Perforation | 246.30 | 246.80 | 13 |
2012-05-10 | Perforation | 244.20 | 245.20 | 13 |
2012-05-10 | Perforation | 242.00 | 243.00 | 13 |
2012-05-10 | Perforation | 214.00 | 215.00 | 13 |
2013-11-06 | Multi-Stage Fracture | 450.70 | 451.70 | 0 |
2013-11-06 | Multi-Stage Fracture | 444.00 | 445.50 | 0 |
2013-11-06 | Multi-Stage Fracture | 429.00 | 430.00 | 0 |
2013-11-06 | Multi-Stage Fracture | 396.50 | 397.50 | 0 |
2012-05-10 | Perforation | 429.00 | 430.00 | 13 |
2013-11-06 | Multi-Stage Fracture | 385.70 | 386.70 | 0 |
2013-11-06 | Multi-Stage Fracture | 380.50 | 382.00 | 0 |
2013-11-06 | Multi-Stage Fracture | 370.00 | 372.50 | 0 |
2013-11-06 | Multi-Stage Fracture | 366.70 | 367.20 | 0 |
2013-11-06 | Multi-Stage Fracture | 361.00 | 363.00 | 0 |
2013-11-06 | Multi-Stage Fracture | 350.00 | 351.50 | 0 |
2013-11-06 | Multi-Stage Fracture | 343.70 | 347.20 | 0 |
2013-11-06 | Multi-Stage Fracture | 338.70 | 339.70 | 0 |
2013-11-06 | Multi-Stage Fracture | 310.00 | 312.00 | 0 |
2013-11-06 | Multi-Stage Fracture | 300.70 | 301.70 | 0 |
2012-05-10 | Perforation | 396.50 | 397.50 | 13 |
2013-11-06 | Multi-Stage Fracture | 286.50 | 288.00 | 0 |
2013-11-06 | Multi-Stage Fracture | 282.20 | 285.20 | 0 |
2013-11-06 | Multi-Stage Fracture | 246.20 | 246.80 | 0 |
2013-11-06 | Multi-Stage Fracture | 214.00 | 215.00 | 0 |
2012-05-10 | Perforation | 392.00 | 393.00 | 13 |
2012-05-10 | Perforation | 385.70 | 386.70 | 13 |
2012-05-10 | Perforation | 380.50 | 382.00 | 13 |
2012-05-10 | Perforation | 370.00 | 372.50 | 13 |
2012-05-10 | Perforation | 368.50 | 369.50 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-11-06 | 2013-11-06 | 747 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 504 | 0.0 | 0.0 | 0.0 |
2014 | 8537 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8423 | 0.0 | 0.0 | 0.0 |
2017 | 6511 | 0.0 | 0.0 | 0.0 |
2018 | 5138 | 0.0 | 0.0 | 0.0 |
2019 | 5874 | 0.0 | 0.0 | 0.0 |
2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-10 | No Incident Encountered | 0.00 | 0.00 |
2013-11-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]