If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202307002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.104686,"lon":-112.752059,"icon":""}]} |
Location: 00/07-23-036-20W4/2 | |
Location Alias: 00/07-23-36-20 W4M | |
Location Alias 2: 00/07-23-036-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 23 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: PENGROWTH FENNBV 7-23-36-20 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0004230 | |
License Date: 1952-02-16 | |
License Status: Issued | |
Spud Date: 1952-02-21 | |
Final Drill Date: 1952-03-16 | |
Well Total Depth: 1617.90 m | |
Surface Hole Latitude: 52.104686 | |
Surface Hole Longitude: -112.752059 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-02-16 | Obtained License |
1952-03-16 | Finished Drilling |
1952-03-16 | Well Mode changed to Drilled and Cased |
1952-03-17 | Production Casing Operation Performed |
1952-03-20 | Drill Stem Test Performed |
1952-03-20 | Perforation Treatment Performed - Open-Hole Completion |
1953-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1953-03-02 | Perforation Treatment Performed - Jet Perforation |
1953-03-06 | Well Began Production |
1953-03-06 | Well Fluid changed to Crude Oil |
1953-03-06 | Well Mode changed to Flowing |
1953-04-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-09-12 | Perforation Treatment Performed - Cement Squeeze |
1978-09-13 | Perforation Treatment Performed - Cement Squeeze |
1978-09-22 | Perforation Treatment Performed - Open-Hole Completion |
1978-10-13 | Perforation Treatment Performed - Jet Perforation |
1978-10-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-10-28 | Well Fluid changed to Crude Oil |
1978-10-28 | Well Mode changed to Flowing |
1985-05-17 | Perforation Treatment Performed - Cement Squeeze |
1985-05-21 | Well Log Performed |
1985-05-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1985-05-22 | Perforation Treatment Performed - Jet Perforation |
1986-07-24 | Perforation Treatment Performed - Cement Squeeze |
1986-07-25 | Well Log Performed |
1986-07-26 | Perforation Treatment Performed - Jet Perforation |
1987-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-18 | Well Fluid changed to Crude Oil |
1988-02-18 | Well Mode changed to Pumping |
1995-10-07 | Well Log Performed |
1995-10-08 | Perforation Treatment Performed - Jet Perforation |
1995-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-12 | Well Log Performed |
1997-06-14 | Perforation Treatment Performed - Jet Perforation |
1997-06-14 | Well Log Performed |
1997-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-05-31 | Well Log Performed |
2010-06-03 | Well Log Performed |
2010-06-05 | Perforation Treatment Performed - Jet Perforation |
2010-06-05 | Well Log Performed |
2010-06-06 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-03-20 | Open Hole/Barefoot Completion | 1616.40 | 1617.90 | 0 |
1985-05-17 | Cement Squeeze | 1575.50 | 1579.80 | 0 |
1985-05-22 | Perforation | 1569.70 | 1572.70 | 13 |
1985-05-22 | Acid Wash | 1569.70 | 1572.70 | 0 |
1986-07-24 | Cement Squeeze | 1569.70 | 1572.70 | 0 |
1986-07-26 | Perforation | 1569.70 | 1571.20 | 13 |
1987-09-03 | Acid Treatment | 1569.70 | 1571.20 | 0 |
1988-02-04 | Acid Treatment | 1569.70 | 1571.20 | 0 |
1995-10-08 | Perforation | 1614.80 | 1616.40 | 13 |
1995-10-09 | Acid Treatment | 1614.80 | 1616.40 | 0 |
1997-06-14 | Perforation | 1566.00 | 1570.00 | 18 |
1953-03-01 | Packing Device Capped w/Cement | 1603.20 | 1603.20 | 0 |
1997-06-15 | Acid Treatment | 1566.00 | 1570.00 | 0 |
1997-06-17 | Acid Treatment | 1569.70 | 1617.90 | 0 |
2010-06-05 | Perforation | 215.00 | 216.00 | 13 |
2010-06-06 | Cement Squeeze | 215.00 | 216.00 | 0 |
1953-03-02 | Perforation | 1591.10 | 1594.10 | 13 |
1953-04-25 | Acid Wash | 1591.10 | 1594.10 | 0 |
1978-09-12 | Cement Squeeze | 1591.10 | 1594.10 | 0 |
1978-09-13 | Cement Squeeze | 1591.10 | 1594.10 | 0 |
1978-09-22 | Open Hole/Barefoot Completion | 1616.40 | 1617.90 | 0 |
1978-10-13 | Perforation | 1575.50 | 1579.80 | 13 |
1978-10-17 | Acid Wash | 1575.50 | 1579.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 2580 | 0.0 | 0.0 | 0.0 |
1971 | 2514 | 0.0 | 0.0 | 0.0 |
1972 | 4135 | 0.0 | 0.0 | 0.0 |
1973 | 6772 | 0.0 | 0.0 | 0.0 |
1974 | 7308 | 0.0 | 0.0 | 0.0 |
1975 | 6732 | 0.0 | 0.0 | 0.0 |
1976 | 4766 | 0.0 | 0.0 | 0.0 |
1977 | 4872 | 0.0 | 0.0 | 0.0 |
1978 | 4336 | 0.0 | 0.0 | 0.0 |
1979 | 6779 | 0.0 | 0.0 | 0.0 |
1980 | 5432 | 0.0 | 0.0 | 0.0 |
1981 | 7305 | 0.0 | 0.0 | 0.0 |
1982 | 7373 | 0.0 | 0.0 | 0.0 |
1983 | 7731 | 0.0 | 0.0 | 0.0 |
1984 | 8155 | 0.0 | 0.0 | 0.0 |
1985 | 8533 | 0.0 | 0.0 | 0.0 |
1986 | 8179 | 0.0 | 0.0 | 0.0 |
1987 | 8217 | 0.0 | 0.0 | 0.0 |
1988 | 8509 | 0.0 | 0.0 | 0.0 |
1989 | 8464 | 0.0 | 0.0 | 0.0 |
1990 | 8465 | 0.0 | 0.0 | 0.0 |
1991 | 8325 | 0.0 | 0.0 | 0.0 |
1992 | 8748 | 0.0 | 0.0 | 0.0 |
1993 | 7677 | 0.0 | 0.0 | 0.0 |
1994 | 8694 | 0.0 | 0.0 | 0.0 |
1995 | 8018 | 0.0 | 0.0 | 0.0 |
1996 | 8628 | 0.0 | 0.0 | 0.0 |
1997 | 7559 | 0.0 | 0.0 | 0.0 |
1998 | 8630 | 0.0 | 0.0 | 0.0 |
1999 | 8509 | 0.0 | 0.0 | 0.0 |
2000 | 8743 | 0.0 | 0.0 | 0.0 |
2001 | 8490 | 0.0 | 0.0 | 0.0 |
2002 | 8641 | 0.0 | 0.0 | 0.0 |
2003 | 8389 | 0.0 | 0.0 | 0.0 |
2004 | 6774 | 0.0 | 0.0 | 0.0 |
2006 | 6463 | 0.0 | 0.0 | 0.0 |
2007 | 7216 | 0.0 | 0.0 | 0.0 |
2008 | 8056 | 0.0 | 0.0 | 0.0 |
2009 | 8395 | 0.0 | 0.0 | 0.0 |
2010 | 7764 | 0.0 | 0.0 | 0.0 |
2011 | 8701 | 0.0 | 0.0 | 0.0 |
2012 | 7868 | 0.0 | 0.0 | 0.0 |
2013 | 5397 | 0.0 | 0.0 | 0.0 |
2014 | 8679 | 0.0 | 0.0 | 0.0 |
2015 | 8539 | 0.0 | 0.0 | 0.0 |
2016 | 3788 | 0.0 | 0.0 | 0.0 |
2017 | 8670 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8751 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]