If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364202310000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.108298,"lon":-112.752062,"icon":""}]} |
| Location: 00/10-23-036-20W4/0 | |
| Location Alias: 00/10-23-36-20 W4M | |
| Location Alias 2: 00/10-23-036-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 23 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: PENGROWTH FENNBV 10-23-36-20 | |
| Operator Name: Cona Resources Ltd. | |
| License Number: 0003151 | |
| License Date: 1951-07-07 | |
| License Status: Abandoned | |
| Spud Date: 1951-08-02 | |
| Final Drill Date: 1951-09-27 | |
| Well Total Depth: 1885.50 m | |
| Surface Hole Latitude: 52.108298 | |
| Surface Hole Longitude: -112.752062 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-07-07 | Obtained License |
| 1951-08-18 | Drill Stem Test Performed |
| 1951-09-05 | Drill Stem Test Performed |
| 1951-09-06 | Drill Stem Test Performed |
| 1951-09-08 | Drill Stem Test Performed |
| 1951-09-15 | Production Casing Operation Performed |
| 1951-09-27 | Drill Stem Test Performed |
| 1951-09-27 | Finished Drilling |
| 1951-09-27 | Well Mode changed to Drilled and Cased |
| 1951-10-01 | Perforation Treatment Performed - Jet Perforation |
| 1951-10-02 | Well Began Production |
| 1951-10-02 | Well Fluid changed to Crude Oil |
| 1951-10-02 | Well Mode changed to Flowing |
| 1951-10-15 | Well Fluid changed to Crude Oil |
| 1951-10-15 | Well Mode changed to Pumping |
| 1978-05-25 | Well Log Performed |
| 1979-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-10-31 | Perforation Treatment Performed - Cement Squeeze |
| 1980-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1985-05-24 | Well Log Performed |
| 1985-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-05-25 | Perforation Treatment Performed - Jet Perforation |
| 1985-05-30 | Perforation Treatment Performed - Cement Squeeze |
| 1985-05-31 | Well Log Performed |
| 1985-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-06-04 | Perforation Treatment Performed - Jet Perforation |
| 1986-02-18 | Perforation Treatment Performed - Cement Squeeze |
| 1986-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-02-20 | Perforation Treatment Performed - Jet Perforation |
| 1986-07-17 | Perforation Treatment Performed - Cement Squeeze |
| 1986-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-07-19 | Perforation Treatment Performed - Jet Perforation |
| 1986-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-07-31 | Perforation Treatment Performed - Cement Squeeze |
| 1986-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-08-02 | Perforation Treatment Performed - Jet Perforation |
| 1988-03-01 | Well Fluid changed to Crude Oil |
| 1988-03-01 | Well Mode changed to Suspended |
| 1996-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-06-19 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-19 | Plug Back Performed |
| 1996-06-22 | Perforation Treatment Performed - Remedial Casing |
| 1996-06-25 | Perforation Treatment Performed - Cement Plug |
| 1996-06-25 | Well Fluid changed to Crude Oil |
| 1996-06-25 | Well Mode changed to Abandoned Zone |
| 1996-07-16 | Well Abandoned |
| 1996-07-16 | Well Fluid changed to Crude Oil |
| 1996-07-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-10-01 | Perforation | 1577.00 | 1597.20 | 13 |
| 1985-06-04 | Acid Treatment | 1575.80 | 1580.10 | 0 |
| 1986-02-18 | Cement Squeeze | 1575.80 | 1580.10 | 0 |
| 1986-02-20 | Perforation | 1575.80 | 1577.80 | 13 |
| 1986-02-20 | Acid Treatment | 1575.80 | 1577.80 | 0 |
| 1986-07-17 | Cement Squeeze | 1575.80 | 1577.80 | 0 |
| 1986-07-19 | Perforation | 1575.20 | 1576.80 | 39 |
| 1986-07-19 | Acid Treatment | 1575.20 | 1576.80 | 0 |
| 1986-07-31 | Acid Treatment | 1575.20 | 1576.80 | 0 |
| 1986-07-31 | Cement Squeeze | 1575.20 | 1576.80 | 0 |
| 1986-08-02 | Perforation | 1576.80 | 1577.80 | 13 |
| 1979-05-14 | Acid Treatment | 1577.00 | 1597.20 | 0 |
| 1986-08-02 | Acid Treatment | 1576.80 | 1577.80 | 0 |
| 1996-06-19 | Packing Device Capped w/Cement | 1554.00 | 1562.00 | 0 |
| 1996-06-19 | Perforation | 271.00 | 272.00 | 13 |
| 1996-06-22 | Remedial Casing Cementing | 271.00 | 272.00 | 0 |
| 1996-06-25 | Cement Plug | 191.00 | 272.00 | 0 |
| 1980-10-31 | Cement Squeeze | 1577.00 | 1597.20 | 0 |
| 1980-11-04 | Perforation | 1591.00 | 1594.00 | 13 |
| 1980-11-04 | Acid Treatment | 1591.00 | 1594.00 | 0 |
| 1985-05-25 | Perforation | 1584.00 | 1586.50 | 6 |
| 1985-05-25 | Acid Treatment | 1584.00 | 1586.50 | 0 |
| 1985-05-30 | Cement Squeeze | 1584.00 | 1594.00 | 0 |
| 1985-06-04 | Perforation | 1575.80 | 1580.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 5440 | 0.0 | 0.0 | 0.0 |
| 1968 | 5033 | 0.0 | 0.0 | 0.0 |
| 1969 | 6320 | 0.0 | 0.0 | 0.0 |
| 1970 | 5427 | 0.0 | 0.0 | 0.0 |
| 1971 | 4979 | 0.0 | 0.0 | 0.0 |
| 1972 | 5691 | 0.0 | 0.0 | 0.0 |
| 1973 | 6295 | 0.0 | 0.0 | 0.0 |
| 1974 | 7389 | 0.0 | 0.0 | 0.0 |
| 1975 | 6748 | 0.0 | 0.0 | 0.0 |
| 1976 | 5046 | 0.0 | 0.0 | 0.0 |
| 1977 | 4692 | 0.0 | 0.0 | 0.0 |
| 1978 | 5266 | 0.0 | 0.0 | 0.0 |
| 1979 | 6929 | 0.0 | 0.0 | 0.0 |
| 1980 | 5759 | 0.0 | 0.0 | 0.0 |
| 1981 | 7391 | 0.0 | 0.0 | 0.0 |
| 1982 | 6168 | 0.0 | 0.0 | 0.0 |
| 1983 | 8007 | 0.0 | 0.0 | 0.0 |
| 1984 | 8265 | 0.0 | 0.0 | 0.0 |
| 1985 | 8354 | 0.0 | 0.0 | 0.0 |
| 1986 | 7961 | 0.0 | 0.0 | 0.0 |
| 1987 | 8400 | 0.0 | 0.0 | 0.0 |
| 1988 | 474 | 0.0 | 0.0 | 0.0 |
For data sources see[5]