If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202603020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.115986,"lon":-112.75819,"icon":""}]} |
Location: 02/03-26-036-20W4/0 | |
Location Alias: 02/03-26-36-20 W4M | |
Location Alias 2: 02/03-26-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 26 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW FENNBV 3-26N-36-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0005118 | |
License Date: 1952-08-11 | |
License Status: Issued | |
Spud Date: 1952-08-15 | |
Final Drill Date: 1952-09-04 | |
Well Total Depth: 1596.20 m | |
Surface Hole Latitude: 52.115986 | |
Surface Hole Longitude: -112.758190 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-08-11 | Obtained License |
1952-09-04 | Finished Drilling |
1952-09-04 | Production Casing Operation Performed |
1952-09-04 | Well Mode changed to Drilled and Cased |
1952-09-07 | Perforation Treatment Performed - Open-Hole Completion |
1952-09-10 | Well Began Production |
1952-09-10 | Well Fluid changed to Crude Oil |
1952-09-10 | Well Mode changed to Flowing |
1986-01-07 | Perforation Treatment Performed - Cement Plug |
1986-01-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-01-08 | Perforation Treatment Performed - Jet Perforation |
1986-02-21 | Well Log Performed |
1986-02-22 | Perforation Treatment Performed - Jet Perforation |
1986-02-26 | Perforation Treatment Performed - Jet Perforation |
1986-03-01 | Perforation Treatment Performed - Remedial Casing |
1986-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-22 | Well Log Performed |
1987-04-04 | Well Log Performed |
1987-05-13 | Well Log Performed |
1987-06-06 | Well Log Performed |
1987-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-14 | Perforation Treatment Performed - Cement Squeeze |
1987-06-22 | Perforation Treatment Performed - Jet Perforation |
1987-06-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-06-27 | Perforation Treatment Performed - Cement Squeeze |
1987-06-27 | Perforation Treatment Performed - Jet Perforation |
1987-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-29 | Perforation Treatment Performed - Cement Squeeze |
1987-12-01 | Well Log Performed |
1987-12-03 | Perforation Treatment Performed - Jet Perforation |
1987-12-03 | Well Log Performed |
1987-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-15 | Perforation Treatment Performed - Jet Perforation |
1988-11-07 | Well Log Performed |
1988-11-09 | Perforation Treatment Performed - Cement Squeeze |
1988-11-14 | Perforation Treatment Performed - Jet Perforation |
1988-11-15 | Perforation Treatment Performed - Jet Perforation |
1988-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-20 | Well Fluid changed to Crude Oil |
1989-09-20 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-09-07 | Open Hole/Barefoot Completion | 1587.10 | 1596.20 | 0 |
1987-06-14 | Cement Squeeze | 1579.00 | 1584.00 | 0 |
1987-06-22 | Perforation | 1579.00 | 1579.70 | 13 |
1987-06-23 | Acid Treatment | 1579.00 | 1579.70 | 0 |
1987-06-27 | Cement Squeeze | 1579.00 | 1579.70 | 0 |
1987-06-27 | Perforation | 1578.00 | 1578.20 | 13 |
1987-06-28 | Acid Treatment | 1578.00 | 1578.20 | 0 |
1987-11-29 | Cement Squeeze | 1578.00 | 1578.20 | 0 |
1987-12-03 | Perforation | 1573.90 | 1574.30 | 13 |
1987-12-04 | Acid Treatment | 1573.90 | 1574.30 | 0 |
1987-12-15 | Perforation | 1571.90 | 1573.90 | 13 |
1986-01-07 | Cement Plug | 1585.70 | 1596.20 | 0 |
1987-12-15 | Acid Treatment | 1571.90 | 1573.90 | 0 |
1988-11-09 | Cement Squeeze | 1571.90 | 1574.30 | 0 |
1988-11-14 | Perforation | 1568.00 | 1572.20 | 13 |
1988-11-15 | Perforation | 1570.70 | 1572.20 | 13 |
1988-11-16 | Acid Treatment | 1568.00 | 1572.20 | 0 |
1986-01-08 | Perforation | 1579.00 | 1585.00 | 13 |
1986-01-08 | Acid Treatment | 1579.00 | 1585.00 | 0 |
1986-02-22 | Perforation | 1572.00 | 1572.30 | 13 |
1986-02-26 | Perforation | 1574.00 | 1574.50 | 13 |
1986-03-01 | Remedial Casing Cementing | 1572.00 | 1574.50 | 0 |
1986-03-06 | Acid Treatment | 1579.00 | 1585.00 | 0 |
1987-06-14 | Acid Treatment | 1579.00 | 1584.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5195 | 0.0 | 0.0 | 0.0 |
1968 | 5177 | 0.0 | 0.0 | 0.0 |
1969 | 5548 | 0.0 | 0.0 | 0.0 |
1970 | 6019 | 0.0 | 0.0 | 0.0 |
1971 | 5798 | 0.0 | 0.0 | 0.0 |
1972 | 6451 | 0.0 | 0.0 | 0.0 |
1973 | 6780 | 0.0 | 0.0 | 0.0 |
1974 | 6621 | 0.0 | 0.0 | 0.0 |
1975 | 6522 | 0.0 | 0.0 | 0.0 |
1976 | 5573 | 0.0 | 0.0 | 0.0 |
1977 | 5872 | 0.0 | 0.0 | 0.0 |
1978 | 5817 | 0.0 | 0.0 | 0.0 |
1979 | 7173 | 0.0 | 0.0 | 0.0 |
1980 | 6152 | 0.0 | 0.0 | 0.0 |
1981 | 6614 | 0.0 | 0.0 | 0.0 |
1982 | 5285 | 0.0 | 0.0 | 0.0 |
1983 | 2354 | 0.0 | 0.0 | 0.0 |
1984 | 7137 | 0.0 | 0.0 | 0.0 |
1985 | 3984 | 0.0 | 0.0 | 0.0 |
1986 | 1729 | 0.0 | 0.0 | 0.0 |
1987 | 6505 | 0.0 | 0.0 | 0.0 |
1988 | 8105 | 0.0 | 0.0 | 0.0 |
1989 | 7925 | 0.0 | 0.0 | 0.0 |
1990 | 8491 | 0.0 | 0.0 | 0.0 |
1991 | 8205 | 0.0 | 0.0 | 0.0 |
1992 | 8471 | 0.0 | 0.0 | 0.0 |
1993 | 8019 | 0.0 | 0.0 | 0.0 |
1994 | 8467 | 0.0 | 0.0 | 0.0 |
1995 | 8409 | 0.0 | 0.0 | 0.0 |
1996 | 8506 | 0.0 | 0.0 | 0.0 |
1997 | 7680 | 0.0 | 0.0 | 0.0 |
1998 | 5854 | 0.0 | 0.0 | 0.0 |
2000 | 5554 | 0.0 | 0.0 | 0.0 |
2001 | 8390 | 0.0 | 0.0 | 0.0 |
2002 | 7820 | 0.0 | 0.0 | 0.0 |
2003 | 7521 | 0.0 | 0.0 | 0.0 |
2004 | 5710 | 0.0 | 0.0 | 0.0 |
2005 | 7785 | 0.0 | 0.0 | 0.0 |
2006 | 8358 | 0.0 | 0.0 | 0.0 |
2007 | 8574 | 0.0 | 0.0 | 0.0 |
2008 | 4930 | 0.0 | 0.0 | 0.0 |
2009 | 7424 | 0.0 | 0.0 | 0.0 |
2010 | 7452 | 0.0 | 0.0 | 0.0 |
2011 | 6902 | 0.0 | 0.0 | 0.0 |
2012 | 8202 | 0.0 | 0.0 | 0.0 |
2013 | 7943 | 0.0 | 0.0 | 0.0 |
2014 | 8559 | 0.0 | 0.0 | 0.0 |
2015 | 8417 | 0.0 | 0.0 | 0.0 |
2016 | 8437 | 0.0 | 0.0 | 0.0 |
2017 | 7491 | 0.0 | 0.0 | 0.0 |
2018 | 8613 | 0.0 | 0.0 | 0.0 |
2019 | 8384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]