If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364210202002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.0591,"lon":-112.895895,"icon":""}]} |
| Location: 00/02-02-036-21W4/2 | |
| Location Alias: 00/02-02-36-21 W4M | |
| Location Alias 2: 00/02-02-036-21 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 21 | |
| Section: 02 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: BEARSPAW FENNW 2-2-36-21 | |
| Operator Name: Bearspaw Petroleum Ltd. | |
| License Number: 0331857 | |
| License Date: 2005-05-30 | |
| License Status: Issued | |
| Spud Date: 2005-07-04 | |
| Final Drill Date: 2005-07-05 | |
| Well Total Depth: 812.00 m | |
| Surface Hole Latitude: 52.059100 | |
| Surface Hole Longitude: -112.895895 |
| Date | Event |
|---|---|
| 2005-05-30 | Obtained License |
| 2005-07-04 | Surface Casing Operation Performed |
| 2005-07-05 | Finished Drilling |
| 2005-07-05 | Well Mode changed to Drilled and Cased |
| 2005-07-06 | Production Casing Operation Performed |
| 2005-07-07 | Rig Released |
| 2005-07-14 | Well Log Performed |
| 2005-07-22 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-05 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-17 | Perforation Treatment Performed - Fractured |
| 2005-10-26 | Well Began Production |
| 2005-10-26 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2005-10-26 | Well Mode changed to Flowing |
| 2005-11-24 | Well Log Performed |
| 2005-11-25 | Well Log Performed |
| 2007-10-19 | Well Log Performed |
| 2008-10-20 | Well Log Performed |
| 2009-07-24 | Well Log Performed |
| 2011-08-16 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-07-22 | Perforation | 488.80 | 489.80 | 14 |
| 2005-08-05 | Perforation | 363.80 | 364.80 | 14 |
| 2005-08-05 | Perforation | 361.10 | 362.80 | 14 |
| 2005-08-05 | Perforation | 344.70 | 345.00 | 14 |
| 2005-08-05 | Perforation | 342.00 | 342.40 | 14 |
| 2005-08-05 | Perforation | 340.30 | 341.30 | 14 |
| 2005-08-05 | Perforation | 337.40 | 339.10 | 14 |
| 2005-08-05 | Perforation | 331.10 | 331.40 | 14 |
| 2005-08-05 | Perforation | 328.20 | 330.00 | 14 |
| 2005-08-05 | Perforation | 325.90 | 326.30 | 14 |
| 2005-08-05 | Perforation | 311.20 | 312.60 | 14 |
| 2005-08-05 | Perforation | 476.10 | 476.40 | 14 |
| 2005-08-05 | Perforation | 303.50 | 303.80 | 14 |
| 2005-08-05 | Perforation | 268.00 | 268.70 | 14 |
| 2005-08-05 | Perforation | 238.70 | 239.00 | 14 |
| 2005-08-05 | Perforation | 229.10 | 229.40 | 14 |
| 2005-08-05 | Perforation | 206.30 | 206.60 | 14 |
| 2005-08-05 | Perforation | 205.60 | 205.90 | 14 |
| 2005-08-05 | Perforation | 195.30 | 195.60 | 14 |
| 2005-10-17 | Fracture | 488.80 | 489.80 | 0 |
| 2005-10-17 | Fracture | 195.30 | 476.40 | 0 |
| 2005-08-05 | Perforation | 436.00 | 436.70 | 14 |
| 2005-08-05 | Perforation | 421.30 | 422.70 | 14 |
| 2005-08-05 | Perforation | 418.90 | 419.50 | 14 |
| 2005-08-05 | Perforation | 403.90 | 404.20 | 14 |
| 2005-08-05 | Perforation | 376.10 | 376.70 | 14 |
| 2005-08-05 | Perforation | 372.90 | 374.80 | 14 |
| 2005-08-05 | Perforation | 365.40 | 366.40 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 1404 | 0.0 | 0.0 | 0.0 |
| 2006 | 8240 | 0.0 | 0.0 | 0.0 |
| 2007 | 8543 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8736 | 0.0 | 0.0 | 0.0 |
| 2012 | 7142 | 0.0 | 0.0 | 0.0 |
| 2013 | 8181 | 0.0 | 0.0 | 0.0 |
| 2014 | 8478 | 0.0 | 0.0 | 0.0 |
| 2015 | 6861 | 0.0 | 0.0 | 0.0 |
| 2018 | 492 | 0.0 | 0.0 | 0.0 |
| 2019 | 5649 | 0.0 | 0.0 | 0.0 |
| 2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[5]