X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364252606020

Well Details

Well ID: 0364252606020
Loading map...
Location: 02/06-26-036-25W4/0
Location Alias: 02/06-26-36-25 W4M
Location Alias 2: 02/06-26-036-25 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 25
Section: 26
County/Municipality: Red Deer County
Well Name: SOC MIKWAN 6-26-36-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0177423
License Date: 1995-04-13
License Status: Abandoned
Spud Date: 1995-04-21
Final Drill Date: 1995-04-26
Well Total Depth: 1560.00 m
Surface Hole Latitude: 52.119185
Surface Hole Longitude: -113.472374

For data sources see[1][2]

Well History

Date Event
1995-04-13 Obtained License
1995-04-23 Surface Casing Operation Performed
1995-04-26 Finished Drilling
1995-04-26 Well Log Performed
1995-04-27 Production Casing Operation Performed
1995-04-27 Rig Released
1995-04-27 Well Mode changed to Drilled and Cased
1995-04-29 Perforation Treatment Performed - Jet Perforation
1995-04-29 Well Log Performed
1995-05-02 Perforation Treatment Performed - Fractured
2000-04-02 Well Log Performed
2000-04-02 Well Mode changed to Drilled and Cased
2000-04-03 Perforation Treatment Performed - Jet Perforation
2000-04-03 Well Log Performed
2000-08-01 Well Fluid changed to Gas
2000-08-01 Well Mode changed to Testing
2000-09-01 Well Began Production
2000-09-01 Well Fluid changed to Gas
2000-09-01 Well Mode changed to Flowing
2000-09-02 Well Fluid changed to Gas
2000-09-02 Well Mode changed to Suspended
2001-10-16 Well Log Performed
2010-06-30 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-06-30 Plug Back Performed
2010-06-30 Well Fluid changed to Gas
2010-06-30 Well Mode changed to Abandoned Zone
2010-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-02 Perforation Treatment Performed - Cement Squeeze
2010-07-02 Perforation Treatment Performed - Jet Perforation
2010-07-02 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-07-02 Plug Back Performed
2010-07-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-04-29 Perforation 1512.50 1516.00 17
2010-07-02 Packing Device Capped w/Cement 784.00 792.00 0
2010-07-02 Perforation 329.40 330.00 72
2010-07-02 Cement Squeeze 329.40 330.00 0
2010-07-02 Packing Device Capped w/Cement 317.00 325.00 0
1995-05-02 Fracture 1512.50 1516.00 0
2000-04-03 Perforation 802.00 805.00 20
2000-04-03 Perforation 822.00 824.00 20
2000-04-03 Perforation 849.00 852.00 20
2000-04-03 Perforation 931.00 934.00 20
2000-04-03 Perforation 802.00 934.00 0
2010-06-30 Packing Dev Cpd w/Res-Gyp Cem 1497.00 1500.00 0
2010-07-02 Packing Dev Cpd w/Res-Gyp Cem 837.00 840.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 81 0.0 0.0 0.0

For data sources see[5]

References