If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364262808003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.120646,"lon":-113.65415,"icon":""}]} |
Location: 00/08-28-036-26W4/3 | |
Location Alias: 00/08-28-36-26 W4M | |
Location Alias 2: 00/08-28-036-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Red Deer County | |
Well Name: Vantage THREEHCK 8-28-36-26 | |
Operator Name: Vantage Point Resources Inc. | |
License Number: 0193435 | |
License Date: 1996-11-13 | |
License Status: Issued | |
Spud Date: 1996-11-23 | |
Final Drill Date: 1996-12-02 | |
Well Total Depth: 1857.00 m | |
Surface Hole Latitude: 52.120646 | |
Surface Hole Longitude: -113.654150 |
Date | Event |
---|---|
1996-11-13 | Obtained License |
1996-11-24 | Surface Casing Operation Performed |
1996-11-25 | Direction Drilling Operation Performed - Deviate |
1996-12-02 | Drill Stem Test Performed |
1996-12-02 | Finished Drilling |
1996-12-02 | Well Log Performed |
1996-12-02 | Well Mode changed to Drilled and Cased |
1996-12-03 | Drill Stem Test Performed |
1996-12-05 | Drill Stem Test Performed |
1996-12-06 | Production Casing Operation Performed |
1996-12-06 | Rig Released |
1996-12-15 | Well Log Performed |
1996-12-16 | Well Log Performed |
1996-12-17 | Perforation Treatment Performed - Jet Perforation |
1996-12-18 | Perforation Treatment Performed - Fractured |
1999-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-01-28 | Plug Back Performed |
1999-01-28 | Well Log Performed |
1999-01-29 | Perforation Treatment Performed - Jet Perforation |
2000-10-06 | Perforation Treatment Performed - Jet Perforation |
2000-10-06 | Well Log Performed |
2000-10-06 | Well Mode changed to Drilled and Cased |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-11-25 | 350.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-12-17 | Perforation | 1604.50 | 1607.00 | 18 |
1996-12-18 | Fracture | 1604.50 | 1607.00 | 0 |
1999-01-28 | Packing Device Capped w/Cement | 1586.00 | 1594.00 | 0 |
1999-01-29 | Perforation | 1021.80 | 1025.00 | 18 |
2000-10-06 | Perforation | 988.00 | 993.00 | 17 |
For data sources see[5]