X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365030804000

Well Details

Well ID: 0365030804000
Loading map...
Location: 00/04-08-036-03W5/0
Location Alias: 00/04-08-36-03 W5M
Location Alias 2: 00/04-08-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 08
County/Municipality: Red Deer County
Well Name: NAL GARR 4-8-36-3
Operator Name: NAL Resources Limited
License Number: 0067423
License Date: 1977-12-14
License Status: Suspension
Spud Date: 1978-03-27
Final Drill Date: 1978-04-14
Well Total Depth: 2118.40 m
Surface Hole Latitude: 52.073995
Surface Hole Longitude: -114.402565

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-14 Obtained License
1978-04-14 Finished Drilling
1978-04-14 Well Mode changed to Drilled and Cased
1978-04-16 Production Casing Operation Performed
1978-05-23 Perforation Treatment Performed - Jet Perforation
1978-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-22 Perforation Treatment Performed - Fractured
1978-09-30 Perforation Treatment Performed - Fractured
1978-09-30 Perforation Treatment Performed - Jet Perforation
1978-11-13 Well Began Production
1978-11-13 Well Fluid changed to Crude Oil
1978-11-13 Well Mode changed to Flowing
1988-09-07 Well Fluid changed to Crude Oil
1988-09-07 Well Mode changed to Pumping
1996-12-08 Well Fluid changed to Crude Oil
1996-12-08 Well Mode changed to Suspended
2003-11-29 Perforation Treatment Performed - Jet Perforation
2003-11-30 Perforation Treatment Performed - Remedial Casing
2003-12-02 Perforation Treatment Performed - Jet Perforation
2003-12-03 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-05-23 Perforation 2089.70 2091.50 13
1978-05-24 Acid Treatment 2089.70 2091.50 0
1978-07-22 Fracture 2089.70 2091.50 0
1978-09-30 Perforation 1810.50 1813.00 13
1978-09-30 Fracture 1810.50 1813.00 0
2003-11-29 Perforation 1008.00 1010.00 14
2003-11-30 Remedial Casing Cementing 1008.00 1010.00 0
2003-12-02 Perforation 495.50 497.00 14
2003-12-03 Remedial Casing Cementing 495.50 497.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 919 0.0 0.0 0.0
1979 6387 0.0 0.0 0.0
1980 5457 0.0 0.0 0.0
1981 6653 0.0 0.0 0.0
1982 5934 0.0 0.0 0.0
1983 7952 0.0 0.0 0.0
1984 8192 0.0 0.0 0.0
1985 7484 0.0 0.0 0.0
1986 7460 0.0 0.0 0.0
1987 8000 0.0 0.0 0.0
1988 7164 0.0 0.0 0.0
1989 8717 0.0 0.0 0.0
1990 7899 0.0 0.0 0.0
1991 8263 0.0 0.0 0.0
1992 8607 0.0 0.0 0.0
1993 8043 0.0 0.0 0.0
1994 8167 0.0 0.0 0.0
1995 6791 0.0 0.0 0.0

For data sources see[5]

References