X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365032704000

Well Details

Well ID: 0365032704000
Loading map...
Location: 00/04-27-036-03W5/0
Location Alias: 00/04-27-36-03 W5M
Location Alias 2: 00/04-27-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 27
County/Municipality: Red Deer County
Well Name: NAL LANAWAY 4-27-36-3
Operator Name: NAL Resources Limited
License Number: 0018199
License Date: 1959-11-30
License Status: Suspension
Spud Date: 1959-12-05
Final Drill Date: 1959-12-30
Well Total Depth: 2369.80 m
Surface Hole Latitude: 52.117322
Surface Hole Longitude: -114.354953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-30 Obtained License
1959-12-30 Finished Drilling
1959-12-30 Well Mode changed to Drilled and Cased
1959-12-31 Drill Stem Test Performed
1960-01-01 Production Casing Operation Performed
1960-01-16 Perforation Treatment Performed - Jet Perforation
1960-01-17 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-01-20 Perforation Treatment Performed - Jet Perforation
1960-01-21 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-03 Perforation Treatment Performed - Cement Squeeze
1960-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-05 Perforation Treatment Performed - Jet Perforation
1960-02-08 Perforation Treatment Performed - Cement Squeeze
1960-02-09 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-10 Perforation Treatment Performed - Fractured
1960-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-12 Perforation Treatment Performed - Fractured
1960-03-06 Well Began Production
1960-03-06 Well Fluid changed to Crude Oil
1960-03-06 Well Mode changed to Flowing
1960-09-02 Well Fluid changed to Crude Oil
1960-09-02 Well Mode changed to Gas Lift
1976-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-21 Perforation Treatment Performed - Jet Perforation
1976-09-22 Perforation Treatment Performed - Fractured
2019-09-01 Well Fluid changed to Crude Oil
2019-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-16 Perforation 2342.10 2345.70 7
1960-02-05 Perforation 2317.70 2319.50 7
1960-02-05 Acid Treatment 2317.70 2319.50 0
1960-02-08 Cement Squeeze 2320.10 2324.10 0
1960-02-08 Cement Squeeze 2317.70 2319.50 0
1960-02-09 Hydra Jet Perforation 2268.30 2270.80 13
1960-02-09 Hydra Jet Perforation 2272.00 2273.20 13
1960-02-09 Hydra Jet Perforation 2274.40 2275.60 13
1960-02-10 Acid Treatment 2268.30 2275.60 0
1960-02-10 Fracture 2268.30 2275.60 0
1960-02-12 Acid Treatment 2268.30 2275.60 0
1960-01-17 Acid Wash 2342.10 2345.70 0
1960-02-12 Fracture 2268.30 2275.60 0
1976-09-21 Perforation 2270.80 2279.90 7
1976-09-21 Acid Treatment 2270.80 2279.90 0
1976-09-22 Fracture 2270.80 2279.90 0
1960-01-20 Perforation 2332.90 2336.00 13
1960-01-20 Perforation 2329.30 2331.10 13
1960-01-20 Packing Device Capped w/Cement 2340.90 2340.90 0
1960-01-21 Acid Wash 2329.30 2336.00 0
1960-01-30 Acid Treatment 2329.30 2336.00 0
1960-02-03 Cement Squeeze 2329.30 2336.00 0
1960-02-05 Perforation 2320.10 2324.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 3983 0.0 0.0 0.0
1971 7893 0.0 0.0 0.0
1972 7763 0.0 0.0 0.0
1973 7604 0.0 0.0 0.0
1974 7894 0.0 0.0 0.0
1975 8192 0.0 0.0 0.0
1976 7436 0.0 0.0 0.0
1977 8180 0.0 0.0 0.0
1978 8176 0.0 0.0 0.0
1979 7948 0.0 0.0 0.0
1980 7947 0.0 0.0 0.0
1981 8055 0.0 0.0 0.0
1982 8097 0.0 0.0 0.0
1983 8295 0.0 0.0 0.0
1984 7696 0.0 0.0 0.0
1985 8406 0.0 0.0 0.0
1986 8162 0.0 0.0 0.0
1987 8662 0.0 0.0 0.0
1988 8365 0.0 0.0 0.0
1989 8247 0.0 0.0 0.0
1990 6531 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8303 0.0 0.0 0.0
1993 8617 0.0 0.0 0.0
1994 8567 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 8261 0.0 0.0 0.0
1997 8498 0.0 0.0 0.0
1998 8728 0.0 0.0 0.0
1999 8666 0.0 0.0 0.0
2000 8623 0.0 0.0 0.0
2001 8557 0.0 0.0 0.0
2002 7810 0.0 0.0 0.0
2003 8135 0.0 0.0 0.0
2004 8465 0.0 0.0 0.0
2005 5065 0.0 0.0 0.0
2006 6245 0.0 0.0 0.0
2007 7387 0.0 0.0 0.0
2008 8174 0.0 0.0 0.0
2009 8718 0.0 0.0 0.0
2010 8543 0.0 0.0 0.0
2011 8625 0.0 0.0 0.0
2012 8494 0.0 0.0 0.0
2013 8471 0.0 0.0 0.0
2014 8533 0.0 0.0 0.0
2015 8006 0.0 0.0 0.0
2017 72 0.0 0.0 0.0
2018 24 0.0 0.0 0.0

For data sources see[5]

References