If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0365033312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.138063,"lon":-114.38037,"icon":""}]} |
Location: 00/12-33-036-03W5/0 | |
Location Alias: 00/12-33-36-03 W5M | |
Location Alias 2: 00/12-33-036-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 5 | |
Range: 03 | |
Section: 33 | |
County/Municipality: Red Deer County | |
Well Name: GBASINS ET AL LANAWAY 12-33-36-3 | |
Operator Name: United Canso Oil & Gas Ltd. | |
License Number: 0044075 | |
License Date: 1972-11-07 | |
License Status: RecCertified | |
Spud Date: 1972-11-14 | |
Final Drill Date: 1972-12-11 | |
Well Total Depth: 2959.60 m | |
Surface Hole Latitude: 52.138063 | |
Surface Hole Longitude: -114.380370 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-11-07 | Obtained License |
1972-12-11 | Finished Drilling |
1972-12-11 | Well Mode changed to Drilled and Cased |
1972-12-19 | Production Casing Operation Performed |
1972-12-30 | Perforation Treatment Performed - Jet Perforation |
1972-12-31 | Perforation Treatment Performed - Fractured |
1972-12-31 | Perforation Treatment Performed - Jet Perforation |
1973-01-15 | Perforation Treatment Performed - Jet Perforation |
1973-01-16 | Perforation Treatment Performed - Cement Squeeze |
1973-05-25 | Well Began Production |
1973-05-25 | Well Fluid changed to Crude Oil |
1973-05-25 | Well Mode changed to Pumping |
1974-11-13 | Perforation Treatment Performed - Cement Plug |
1974-11-16 | Well Abandoned |
1974-11-16 | Well Fluid changed to Crude Oil |
1974-11-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-12-30 | Perforation | 1771.50 | 1775.20 | 7 |
1972-12-31 | Perforation | 1768.10 | 1769.10 | 3 |
1972-12-31 | Fracture | 1768.10 | 1775.20 | 0 |
1973-01-15 | Perforation | 1663.60 | 1664.20 | 7 |
1973-01-16 | Cement Squeeze | 1663.60 | 1664.20 | 0 |
1974-11-13 | Cement Plug | 1735.20 | 1789.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1973 | 4441 | 0.0 | 0.0 | 0.0 |
1974 | 5135 | 0.0 | 0.0 | 0.0 |
For data sources see[5]