If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365041810002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.096382,"lon":-114.556558,"icon":""}]} |
| Location: 00/10-18-036-04W5/2 | |
| Location Alias: 00/10-18-36-04 W5M | |
| Location Alias 2: 00/10-18-036-04 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 18 | |
| County/Municipality: Red Deer County | |
| Well Name: Sitka Expl GARR 10-18-36-4 | |
| Operator Name: Sitka Exploration Ltd. | |
| License Number: 0052010 | |
| License Date: 1974-11-27 | |
| License Status: Suspension | |
| Spud Date: 1974-12-01 | |
| Final Drill Date: 1974-12-29 | |
| Well Total Depth: 2548.10 m | |
| Surface Hole Latitude: 52.096382 | |
| Surface Hole Longitude: -114.556558 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1974-11-27 | Obtained License |
| 1974-12-21 | Drill Stem Test Performed |
| 1974-12-29 | Finished Drilling |
| 1974-12-29 | Well Mode changed to Drilled and Cased |
| 1974-12-31 | Production Casing Operation Performed |
| 1975-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1975-02-26 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-01 | Perforation Treatment Performed - Cement Squeeze |
| 1975-03-05 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1975-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-10 | Perforation Treatment Performed - Cement Squeeze |
| 1976-03-24 | Perforation Treatment Performed - Fractured |
| 1976-03-25 | Perforation Treatment Performed - Fractured |
| 1976-04-08 | Perforation Treatment Performed - Alcohol Squeeze |
| 2010-03-29 | Well Log Performed |
| 2010-03-30 | Well Log Performed |
| 2010-03-31 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-31 | Well Log Performed |
| 2010-04-06 | Perforation Treatment Performed - Fractured |
| 2010-04-11 | Well Began Production |
| 2010-04-11 | Well Fluid changed to Gas |
| 2010-04-11 | Well Mode changed to Pumping |
| 2010-06-13 | Well Log Performed |
| 2010-06-18 | Well Log Performed |
| 2011-04-01 | Well Fluid changed to Gas |
| 2011-04-01 | Well Mode changed to Suspended |
| 2011-07-01 | Well Fluid changed to Gas |
| 2011-07-01 | Well Mode changed to Pumping |
| 2011-12-01 | Well Fluid changed to Gas |
| 2011-12-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-02-26 | Perforation | 2453.00 | 2456.10 | 7 |
| 1976-03-10 | Cement Squeeze | 2397.60 | 2406.70 | 0 |
| 1976-03-24 | Fracture | 2424.40 | 2440.50 | 0 |
| 1976-03-25 | Fracture | 2424.40 | 2440.50 | 0 |
| 1976-04-08 | Alchohol Squeeze | 2424.40 | 2440.50 | 0 |
| 2010-03-31 | Perforation | 2397.00 | 2399.40 | 17 |
| 2010-03-31 | Perforation | 2403.00 | 2406.00 | 17 |
| 2010-04-06 | Fracture | 2403.00 | 2406.00 | 0 |
| 2010-04-06 | Fracture | 2397.00 | 2399.40 | 0 |
| 1975-02-26 | Acid Treatment | 2453.00 | 2456.10 | 0 |
| 1975-03-01 | Cement Squeeze | 2453.00 | 2456.10 | 0 |
| 1975-03-05 | Perforation | 2424.40 | 2426.50 | 7 |
| 1975-03-05 | Perforation | 2430.50 | 2434.40 | 7 |
| 1975-03-05 | Perforation | 2439.30 | 2440.50 | 7 |
| 1975-03-06 | Acid Treatment | 2424.40 | 2440.50 | 0 |
| 1975-03-14 | Perforation | 2397.60 | 2406.70 | 13 |
| 1975-03-15 | Acid Treatment | 2397.60 | 2406.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 2106 | 0.0 | 0.0 | 0.0 |
| 2011 | 2760 | 0.0 | 0.0 | 0.0 |
For data sources see[5]