X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365042816000

Well Details

Well ID: 0365042816000
Loading map...
Location: 00/16-28-036-04W5/0
Location Alias: 00/16-28-36-04 W5M
Location Alias 2: 00/16-28-036-04 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 04
Section: 28
County/Municipality: Red Deer County
Well Name: NAL ETAL SYLAKE 16-28-36-4
Operator Name: NAL Resources Limited
License Number: 0202625
License Date: 1997-06-17
License Status: Issued
Spud Date: 1997-07-09
Final Drill Date: 1997-07-27
Well Total Depth: 2438.00 m
Surface Hole Latitude: 52.129349
Surface Hole Longitude: -114.505016

For data sources see[1][2]

Well History

Date Event
1997-06-17 Obtained License
1997-07-11 Surface Casing Operation Performed
1997-07-27 Finished Drilling
1997-07-27 Well Log Performed
1997-07-27 Well Mode changed to Drilled and Cased
1997-07-28 Well Log Performed
1997-07-29 Drill Stem Test Performed
1997-07-29 Well Log Performed
1997-07-30 Drill Stem Test Performed
1997-08-02 Production Casing Operation Performed
1997-08-02 Rig Released
1997-08-07 Well Log Performed
1997-08-08 Perforation Treatment Performed - Jet Perforation
1997-08-12 Perforation Treatment Performed - Jet Perforation
1997-08-12 Well Log Performed
1997-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-18 Perforation Treatment Performed - Cement Squeeze
1997-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-18 Well Began Production
1997-09-18 Well Fluid changed to Crude Oil
1997-09-18 Well Mode changed to Pumping
1998-02-10 Well Log Performed
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Suspended
2002-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-09 Perforation Treatment Performed - Cement Plug
2002-06-09 Plug Back Performed
2002-06-09 Well Fluid changed to Crude Oil
2002-06-09 Well Log Performed
2002-06-09 Well Mode changed to Abandoned Zone
2002-06-10 Perforation Treatment Performed - Jet Perforation
2002-06-10 Well Log Performed
2002-07-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-08 Perforation 2406.00 2411.00 13
2002-06-09 Packing Device Capped w/Cement 2382.00 2390.00 0
2002-06-10 Perforation 2144.00 2148.50 17
2002-07-11 Fracture 2144.00 2148.50 0
1997-08-08 Perforation 2414.50 2416.00 13
1997-08-12 Perforation 2398.90 2399.90 13
1997-08-12 Perforation 2401.00 2403.00 13
1997-08-13 Acid Treatment 2398.90 2403.00 0
1997-08-18 Acid Treatment 2414.50 2416.00 0
1997-08-18 Cement Squeeze 2414.50 2416.00 0
1997-08-21 Acid Treatment 2398.90 2411.00 0
2002-06-09 Cement Plug 2396.40 2404.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2301 0.0 0.0 0.0
1998 596 0.0 0.0 0.0

For data sources see[5]

References