Well Details

Well ID: 0365042816002
Loading map...
Location: 00/16-28-036-04W5/2
Location Alias: 00/16-28-36-04 W5M
Location Alias 2: 00/16-28-036-04 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 04
Section: 28
County/Municipality: Red Deer County
Well Name: NAL ETAL SYLAKE 16-28-36-4
Operator Name: NAL Resources Limited
License Number: 0202625
License Date: 1997-06-17
License Status: Issued
Spud Date: 1997-07-09
Final Drill Date: 1997-07-27
Well Total Depth: 2438.00 m
Surface Hole Latitude: 52.129349
Surface Hole Longitude: -114.505016

For data sources see[1][2]

Well History

Date Event
1997-06-17 Obtained License
1997-07-11 Surface Casing Operation Performed
1997-07-27 Finished Drilling
1997-07-27 Well Log Performed
1997-07-27 Well Mode changed to Drilled and Cased
1997-07-28 Well Log Performed
1997-07-29 Drill Stem Test Performed
1997-07-29 Well Log Performed
1997-07-30 Drill Stem Test Performed
1997-08-02 Production Casing Operation Performed
1997-08-02 Rig Released
1997-08-07 Well Log Performed
1997-08-08 Perforation Treatment Performed - Jet Perforation
1997-08-12 Perforation Treatment Performed - Jet Perforation
1997-08-12 Well Log Performed
1997-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-18 Perforation Treatment Performed - Cement Squeeze
1997-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-10 Well Log Performed
2002-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-09 Perforation Treatment Performed - Cement Plug
2002-06-09 Plug Back Performed
2002-06-09 Well Log Performed
2002-06-10 Perforation Treatment Performed - Jet Perforation
2002-06-10 Well Log Performed
2002-07-11 Perforation Treatment Performed - Fractured
2003-06-27 Well Began Production
2003-06-27 Well Fluid changed to Gas
2003-06-27 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Pumping
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Flowing
2014-06-03 Well Fluid changed to Gas
2014-06-03 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-08 Perforation 2406.00 2411.00 13
2002-06-09 Packing Device Capped w/Cement 2382.00 2390.00 0
2002-06-10 Perforation 2144.00 2148.50 17
2002-07-11 Fracture 2144.00 2148.50 0
1997-08-08 Perforation 2414.50 2416.00 13
1997-08-12 Perforation 2398.90 2399.90 13
1997-08-12 Perforation 2401.00 2403.00 13
1997-08-13 Acid Treatment 2398.90 2403.00 0
1997-08-18 Acid Treatment 2414.50 2416.00 0
1997-08-18 Cement Squeeze 2414.50 2416.00 0
1997-08-21 Acid Treatment 2398.90 2411.00 0
2002-06-09 Cement Plug 2396.40 2404.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4472 0.0 0.0 0.0
2004 8135 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8756 0.0 0.0 0.0
2010 8408 0.0 0.0 0.0
2011 6703 0.0 0.0 0.0
2012 8406 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 8605 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8098 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 3194 0.0 0.0 0.0

For data sources see[5]