X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365042908003

Well Details

Well ID: 0365042908003
Loading map...
Location: 00/08-29-036-04W5/3
Location Alias: 00/08-29-36-04 W5M
Location Alias 2: 00/08-29-036-04 W5/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 04
Section: 29
County/Municipality: Red Deer County
Well Name: RELENTLESS SYLAKE 8-29-36-4
Operator Name: Relentless Resources Ltd.
License Number: 0340694
License Date: 2005-10-21
License Status: Suspension
Spud Date: 2005-11-10
Final Drill Date: 2005-11-21
Well Total Depth: 2438.00 m
Surface Hole Latitude: 52.120226
Surface Hole Longitude: -114.531218

For data sources see[1][2]

Well History

Date Event
2005-10-21 Obtained License
2005-11-12 Surface Casing Operation Performed
2005-11-21 Finished Drilling
2005-11-21 Well Mode changed to Drilled and Cased
2005-11-22 Well Log Performed
2005-11-24 Production Casing Operation Performed
2005-11-24 Rig Released
2005-12-09 Perforation Treatment Performed - Jet Perforation
2005-12-09 Well Log Performed
2005-12-11 Perforation Treatment Performed - Fractured
2005-12-14 Perforation Treatment Performed - Jet Perforation
2005-12-14 Well Log Performed
2005-12-18 Perforation Treatment Performed - Fractured
2011-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-05 Perforation Treatment Performed - Jet Perforation
2011-11-13 Perforation Treatment Performed - Fractured
2012-02-01 Well Began Production
2012-02-01 Well Fluid changed to Crude Oil
2012-02-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-09 Perforation 2406.50 2408.00 20
2005-12-11 Fracture 2406.50 2408.00 0
2005-12-14 Perforation 2388.50 2391.00 20
2005-12-14 Perforation 2396.00 2399.00 20
2005-12-18 Fracture 2388.50 2399.00 0
2011-10-04 Packing Device Capped w/Cement 2368.00 2376.00 0
2011-10-05 Perforation 2177.00 2180.00 17
2011-11-13 Fracture 2177.00 2180.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5997 0.0 0.0 0.0
2013 8354 0.0 0.0 0.0
2014 7320 0.0 0.0 0.0
2015 5256 0.0 0.0 0.0
2016 8504 0.0 0.0 0.0
2017 8303 0.0 0.0 0.0
2018 6636 0.0 0.0 0.0
2019 8114 0.0 0.0 0.0
2020 1655 0.0 0.0 0.0

For data sources see[5]

References