X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365050806000

Well Details

Well ID: 0365050806000
Loading map...
Location: 00/06-08-036-05W5/0
Location Alias: 00/06-08-36-05 W5M
Location Alias 2: 00/06-08-036-05 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 05
Section: 08
County/Municipality: Clearwater County
Well Name: NAL GARR 6-8-36-5
Operator Name: NAL Resources Limited
License Number: 0107030
License Date: 1984-05-10
License Status: Issued
Spud Date: 1984-05-25
Final Drill Date: 1984-06-13
Well Total Depth: 2701.00 m
Surface Hole Latitude: 52.076297
Surface Hole Longitude: -114.680809

For data sources see[1][2]

Well History

Date Event
1984-05-10 Obtained License
1984-05-27 Surface Casing Operation Performed
1984-06-13 Finished Drilling
1984-06-14 Well Log Performed
1984-06-15 Production Casing Operation Performed
1984-06-16 Rig Released
1984-08-10 Well Log Performed
1984-08-13 Perforation Treatment Performed - Jet Perforation
1984-08-14 Perforation Treatment Performed - Selective Jet Perforations
1984-08-16 Perforation Treatment Performed - Fractured
1984-08-23 Well Log Performed
1984-08-25 Well Mode changed to Drilled and Cased
1984-11-23 Perforation Treatment Performed - Jet Perforation
1984-11-23 Well Log Performed
1984-11-24 Perforation Treatment Performed - Jet Perforation
1984-11-25 Perforation Treatment Performed - Fractured
1985-02-17 Perforation Treatment Performed - Jet Perforation
1985-02-18 Perforation Treatment Performed - Fractured
1985-02-18 Well Mode changed to Drilled and Cased
1985-02-21 Well Log Performed
1995-08-27 Perforation Treatment Performed - Cement Squeeze
1995-08-27 Plug Back Performed
1998-10-01 Well Began Production
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Flowing
2007-04-01 Well Fluid changed to Gas
2007-04-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-08-13 Perforation 2661.50 2663.00 7
1984-11-24 Perforation 2595.00 2597.00 7
1984-11-25 Fracture 2595.00 2639.00 0
1985-02-17 Perforation 2564.00 2566.00 13
1985-02-18 Fracture 2564.00 2566.00 0
1995-08-27 Cement Squeeze 2564.00 2566.00 0
1984-08-14 Selective Jet Perforations 2651.20 2652.00 0
1984-08-14 Selective Jet Perforations 2653.70 2656.20 0
1984-08-14 Selective Jet Perforations 2656.60 2657.20 0
1984-08-16 Fracture 2651.20 2663.00 0
1984-11-23 Perforation 2608.00 2613.50 13
1984-11-24 Perforation 2619.50 2621.50 7
1984-11-24 Perforation 2623.50 2625.00 7
1984-11-24 Perforation 2636.50 2639.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1936 0.0 0.0 0.0
1999 7282 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8281 0.0 0.0 0.0
2002 8375 0.0 0.0 0.0
2003 8023 0.0 0.0 0.0
2004 8640 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8016 0.0 0.0 0.0
2008 8712 0.0 0.0 0.0
2009 8408 0.0 0.0 0.0
2010 8629 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 7960 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 8717 0.0 0.0 0.0
2016 8501 0.0 0.0 0.0
2017 8562 0.0 0.0 0.0
2018 8282 0.0 0.0 0.0
2019 8552 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References