X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365053506002

Well Details

Well ID: 0365053506002
Loading map...
Location: 00/06-35-036-05W5/2
Location Alias: 00/06-35-36-05 W5M
Location Alias 2: 00/06-35-036-05 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 05
Section: 35
County/Municipality: Clearwater County
Well Name: NAL GARR 6-35-36-5
Operator Name: NAL Resources Limited
License Number: 0094274
License Date: 1982-01-06
License Status: RecCertified
Spud Date: 1982-02-27
Final Drill Date: 1982-03-19
Well Total Depth: 2565.00 m
Surface Hole Latitude: 52.136633
Surface Hole Longitude: -114.609481

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-06 Obtained License
1982-03-19 Finished Drilling
1982-03-19 Well Mode changed to Drilled and Cased
1982-03-24 Production Casing Operation Performed
1982-04-06 Perforation Treatment Performed - Jet Perforation
1982-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-01 Perforation Treatment Performed - Fractured
2001-03-09 Well Log Performed
2001-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-10 Plug Back Performed
2001-03-10 Well Log Performed
2001-03-11 Perforation Treatment Performed - Jet Perforation
2001-03-11 Well Log Performed
2001-03-11 Well Mode changed to Drilled and Cased
2001-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-09 Plug Back Performed
2009-02-09 Well Log Performed
2009-02-09 Well Mode changed to Abandoned Zone
2009-02-10 Perforation Treatment Performed - Jet Perforation
2009-02-10 Well Log Performed
2009-02-11 Perforation Treatment Performed - Remedial Casing
2009-02-13 Well Log Performed
2009-02-20 Perforation Treatment Performed - Jet Perforation
2009-02-20 Well Log Performed
2009-02-21 Perforation Treatment Performed - Cement Plug
2009-02-21 Perforation Treatment Performed - Remedial Casing
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-23 Well Log Performed
2009-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-25 Perforation Treatment Performed - Remedial Casing
2009-02-27 Well Log Performed
2009-02-28 Perforation Treatment Performed - Jet Perforation
2009-02-28 Well Log Performed
2009-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-01 Perforation Treatment Performed - Remedial Casing
2009-03-02 Perforation Treatment Performed - Cement Plug
2009-03-03 Perforation Treatment Performed - Jet Perforation
2009-03-03 Well Log Performed
2009-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-05 Well Log Performed
2009-04-06 Well Abandoned
2009-04-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-04-06 Perforation 2462.50 2464.00 9
2009-02-09 Packing Device Capped w/Cement 2080.00 2088.00 0
2009-02-10 Perforation 1554.00 1555.00 15
2009-02-11 Remedial Casing Cementing 1554.00 1555.00 0
2009-02-20 Perforation 1275.00 1276.00 13
2009-02-21 Remedial Casing Cementing 1275.00 1276.00 0
2009-02-21 Cement Plug 1184.50 1298.00 0
2009-02-23 Perforation 793.00 794.00 13
2009-02-25 Remedial Casing Cementing 793.00 794.00 0
2009-02-25 Packing Device Capped w/Cement 784.50 790.00 0
2009-02-28 Perforation 692.00 693.00 13
1982-04-06 Perforation 2465.80 2466.00 9
2009-03-01 Remedial Casing Cementing 692.00 693.00 0
2009-03-01 Packing Device Capped w/Cement 688.50 690.00 0
2009-03-02 Cement Plug 680.50 688.50 0
2009-03-03 Perforation 621.00 622.00 13
2009-03-05 Packing Device Capped w/Cement 607.00 615.00 0
1982-04-06 Perforation 2468.00 2471.00 9
1982-04-07 Acid Treatment 2462.50 2471.00 0
1982-06-01 Fracture 2462.50 2471.00 0
2001-03-10 Packing Device Capped w/Cement 2436.90 2444.90 0
2001-03-11 Perforation 2096.00 2101.00 17
2001-03-11 Perforation 2105.00 2111.00 17
2001-03-13 Acid Treatment 2096.00 2111.00 0

For data sources see[4]



References