X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365060506002

Well Details

Well ID: 0365060506002
Loading map...
Location: 00/06-05-036-06W5/2
Location Alias: 00/06-05-36-06 W5M
Location Alias 2: 00/06-05-036-06 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 06
Section: 05
County/Municipality: Clearwater County
Well Name: NAL CAROL 6-5-36-6
Operator Name: NAL Resources Limited
License Number: 0094240
License Date: 1982-01-05
License Status: Suspension
Spud Date: 1982-01-10
Final Drill Date: 1982-02-16
Well Total Depth: 2969.00 m
Surface Hole Latitude: 52.063620
Surface Hole Longitude: -114.825355

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-05 Obtained License
1982-02-16 Finished Drilling
1982-02-21 Production Casing Operation Performed
1982-07-12 Perforation Treatment Performed - Jet Perforation
1982-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-15 Perforation Treatment Performed - Jet Perforation
1982-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-17 Perforation Treatment Performed - Fractured
1982-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-26 Perforation Treatment Performed - Jet Perforation
1982-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-07-30 Perforation Treatment Performed - Fractured
1982-08-09 Perforation Treatment Performed - Jet Perforation
1982-09-01 Well Mode changed to Drilled and Cased
1984-11-04 Well Began Production
1984-11-04 Well Fluid changed to Gas
1984-11-04 Well Mode changed to Flowing
1984-12-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-12 Perforation 2893.00 2906.00 13
1982-07-26 Perforation 2835.00 2838.00 7
1982-07-29 Acid Treatment 2835.00 2850.00 0
1982-07-30 Fracture 2835.00 2850.00 0
1982-08-09 Perforation 2809.00 2812.00 13
1982-07-15 Packing Device Capped w/Cement 2882.00 2890.00 0
1982-07-15 Perforation 2857.50 2860.50 7
1982-07-15 Perforation 2862.00 2865.00 7
1982-07-15 Perforation 2875.00 2878.00 7
1982-07-16 Acid Treatment 2857.50 2878.00 0
1982-07-17 Fracture 2857.50 2878.00 0
1982-07-24 Packing Device Capped w/Cement 2852.00 2856.00 0
1982-07-26 Perforation 2841.50 2850.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 234 0.0 0.0 0.0
1984 469 0.0 0.0 0.0

For data sources see[5]

References