If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374032202B02 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: B0/02-22-037-03W4/2 | |
Location Alias: B0/02-22-37-03 W4M | |
Location Alias 2: B0/02-22-037-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: DAYLIGHT 1B0 PROVOST 2-22-37-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0139632 | |
License Date: 1989-04-20 | |
License Status: RecCertified | |
Spud Date: 1989-04-20 | |
Final Drill Date: 1989-04-22 | |
Well Total Depth: 875.80 m | |
Surface Hole Latitude: 52.187265 | |
Surface Hole Longitude: -110.349952 |
Date | Event |
---|---|
1989-04-20 | Obtained License |
1989-04-21 | Surface Casing Operation Performed |
1989-04-22 | Finished Drilling |
1989-04-22 | Well Log Performed |
1989-04-22 | Well Mode changed to Drilled and Cased |
1989-04-23 | Production Casing Operation Performed |
1989-04-23 | Rig Released |
1989-04-26 | Perforation Treatment Performed - Jet Perforation |
1991-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-12-04 | Perforation Treatment Performed - Jet Perforation |
1991-12-04 | Plug Back Performed |
1991-12-04 | Well Began Production |
1991-12-04 | Well Fluid changed to Crude Oil |
1991-12-04 | Well Mode changed to Pumping |
1993-07-01 | Well Fluid changed to Crude Oil |
1993-07-01 | Well Mode changed to Suspended |
1994-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-09-17 | Plug Back Performed |
1994-09-17 | Well Abandoned |
1994-09-17 | Well Fluid changed to Crude Oil |
1994-09-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-04-26 | Perforation | 842.00 | 845.50 | 13 |
1991-12-04 | Packing Device Capped w/Cement | 837.00 | 840.00 | 0 |
1991-12-04 | Perforation | 830.50 | 832.00 | 13 |
1994-09-17 | Packing Device Capped w/Cement | 818.00 | 826.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 523 | 0.0 | 0.0 | 0.0 |
1992 | 8566 | 0.0 | 0.0 | 0.0 |
1993 | 1248 | 0.0 | 0.0 | 0.0 |
For data sources see[5]