If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374032203B20 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: B2/03-22-037-03W4/0 | |
Location Alias: B2/03-22-37-03 W4M | |
Location Alias 2: B2/03-22-037-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: GEAR PROVOST 3-22-37-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0147542 | |
License Date: 1991-01-22 | |
License Status: Suspension | |
Spud Date: 1991-01-26 | |
Final Drill Date: 1991-01-28 | |
Well Total Depth: 880.00 m | |
Surface Hole Latitude: 52.187220 | |
Surface Hole Longitude: -110.354473 |
Date | Event |
---|---|
1991-01-22 | Obtained License |
1991-01-27 | Surface Casing Operation Performed |
1991-01-28 | Finished Drilling |
1991-01-28 | Well Log Performed |
1991-01-28 | Well Mode changed to Drilled and Cased |
1991-01-29 | Production Casing Operation Performed |
1991-01-29 | Rig Released |
1991-01-31 | Perforation Treatment Performed - Jet Perforation |
1991-02-01 | Well Began Production |
1991-02-01 | Well Fluid changed to Crude Oil |
1991-02-01 | Well Mode changed to Pumping |
1991-05-24 | Perforation Treatment Performed - Jet Perforation |
1995-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-10-28 | Perforation Treatment Performed - Jet Perforation |
1995-10-28 | Plug Back Performed |
1995-10-28 | Well Fluid changed to Crude Oil |
1995-10-28 | Well Mode changed to Abandoned Zone |
2005-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-30 | Plug Back Performed |
2005-05-31 | Perforation Treatment Performed - Jet Perforation |
2005-06-29 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-01-31 | Perforation | 846.50 | 848.00 | 13 |
1991-05-24 | Perforation | 846.50 | 850.00 | 13 |
1995-10-28 | Packing Device Capped w/Cement | 841.00 | 844.00 | 0 |
1995-10-28 | Perforation | 834.50 | 836.00 | 13 |
2005-05-30 | Packing Device Capped w/Cement | 834.50 | 836.00 | 0 |
2005-05-31 | Perforation | 788.70 | 788.90 | 4 |
2005-05-31 | Perforation | 790.10 | 791.00 | 4 |
2005-05-31 | Perforation | 793.30 | 795.00 | 2 |
2005-06-29 | Fracture | 788.70 | 795.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 7817 | 0.0 | 0.0 | 0.0 |
1992 | 8637 | 0.0 | 0.0 | 0.0 |
1993 | 8675 | 0.0 | 0.0 | 0.0 |
1994 | 8679 | 0.0 | 0.0 | 0.0 |
1995 | 7025 | 0.0 | 0.0 | 0.0 |
For data sources see[5]